Ohio lakes · Ross County, Highland County
Paint Creek Lake
Paint Creek Dam, finished in 1974 near Bainbridge, took 10,200 acres for a 1,190-acre lake, displaced about 350 people and flooded a valley of mounds, farms and caves.
- Built 1974
- 1,190 acres
- Paint Creek
- U.S. Army Corps of Engineers, Huntington District
- Published , updated
Paint Creek Lake right now
Summer temperature by depth
Only 1 summer temperature profile with depth has been found for Paint Creek Lake (1975-1975), too few to say what is typical.
Past measurements, not live readings: USGS Ohio Water Science Center, 2 profiles 1975. From the Water Quality Portal, the EPA National Lakes Assessment and the Army Corps' lake records.
At a glance
| Fact | Value |
|---|---|
| Built | Authorized 1938; construction began 1967; dam closed and first impounded March 1974 (corpsdams.org); dedicated June 14, 1974 (USACE, 2023) |
| Dam type / height / length | Rolled rock with central earth core, 118 ft above streambed (164 ft above cutoff), crest about 700 ft at elevation 864 ft (USACE, 2023); 800 ft long per the Corps' cooperating association (corpsdams.org) |
| Embankment volume | 778,000 cubic yards (NID) |
| Spillway | Ogee concrete weir, crest 810 ft, controlled by three 57 x 37 ft tainter gates (USACE, 2023) |
| Outlet | Two 7.5 x 15 ft gates plus a 3 x 5 ft low-flow gate fed by intakes at two levels (USACE, 1974) |
| Summer pool surface area | About 1,190 acres, 29.7 miles of shoreline (USACE, 2023); 1,178 acres and 27.7 miles on the state fishing map (ODNR, 2010) |
| Pool elevations | Summer 798 ft; winter 787.5 ft (USACE, 2023) |
| Normal storage / max storage | 20,310 acre-feet / 145,000 acre-feet (NID) |
| Drainage area | About 573 square miles (USACE, 2023); 576 square miles (NID) |
| Land acquired | 9,614 fee acres + 568 easement acres (USACE, 2023); 10,200 acres including 582 acres of flowage easements, plus 809 acres bought by the state (USACE, 1974) |
| Residents displaced | An estimated 350 people; 98 residential/farm improvement sets, one quarry and 2 commercial properties (USACE, 1974) |
| Project cost | About $25.4 million, essentially complete as of June 1, 1974 (USACE, 1974); about $26 million (corpsdams.org) |
| Benefit-cost ratio | 2.0 to 1 at 3.125 percent interest, FY1974 submission (USACE, 1974) |
| Flood damages prevented | Over $20 million in FY2021; over $293 million cumulative (USACE, 2023); $342 million to date (corpsdams.org) |
| Flood of record before the dam | 56,000 cfs, stage 20.50 ft at Bourneville, March 10, 1964 (USACE, 1974) |
| Record high pool (2020-present gauge) | 834.58 ft, April 8, 2025 (NOAA gauge PCRO1) |
| Operator | U.S. Army Corps of Engineers, Huntington District (NID) |
| Stream impounded | Paint Creek, a tributary of the Scioto River (USACE, 2023) |
| Counties | Ross and Highland (USACE, 1974) |
| Recreation land | Paint Creek State Park: 9,179 acres leased to ODNR, 5,652 of them a wildlife area (USACE, 2023) |
| Visitors | 585,363 in 2014; 259,545 in 2020 (USACE, 2023) |
| Hazard classification | High (NID) |
| NID ID | OH00017 (NID) |
Before the lake
Paint Creek lies within the historic Virginia Military District, land Virginia reserved between the Scioto and Little Miami rivers to satisfy Revolutionary War veterans' land-bounty claims (USACE, 2023). Early settlers came from Virginia, and place names, farming practices and an economic reliance on agriculture that the Corps' own planning documents describe as persisting "today" trace back to that colonial-era settlement pattern (USACE, 2023). The project area covered three townships in each county, Buckskin, Paint and Paxton in Ross and Madison, Paint and Fairfield in Highland (USACE, 1974). The nearest towns were Bainbridge, about 7.4 stream miles below the dam site, and Greenfield, about 10.1 miles above it, with 1,057 and 4,780 people in 1970 (USACE, 1974).
The valley's human history runs much deeper. The Corps' environmental statement points out that the lake sits about 5 miles upstream of a stretch of valley where, according to the 1840s surveyors Squier and Davis, five major Hopewell earthwork complexes stood in the 6 miles between Bainbridge and a point just east of Bourneville, built between about 300 B.C. and A.D. 400 (USACE, 1974). One of them, Seip Earthworks, enclosed 89 acres within more than two miles of embankment wall, and its central mound, 240 by 160 feet and 30 feet high, is the third-largest burial mound the Hopewell built (National Park Service). Seip is part of Hopewell Culture National Historical Park, which became the nation's 25th World Heritage Site in 2023 (National Park Service). The lake area itself held no sites that large, which the statement attributes to a valley floor that is narrow throughout the project (USACE, 1974).
It still held plenty. Archaeological research in the Paint Creek valley dates back to at least 1963, and the most systematic survey, the "McDaniel Shoreline Survey" conducted from 1978 to 1985 by Gary McDaniel of the West Central Ohio Regional Archeological Preservation Office, recorded most of the 71 archaeological sites now catalogued within the lake by the Ohio Archeological Inventory: four earthen mounds, three village sites, two camp sites, a human burial, a rock shelter, and numerous artifact scatter sites (USACE, 2023). Thirteen of these are recorded as submerged, including at least one village and one mound (USACE, 2023). In 1967 the Ohio Historical Society, with the National Park Service and Ohio State University, excavated the Enos Holmes Mound, half a mile from the mouth of Plum Run: 3.8 feet high and 80 feet across, it held 14 burials and the postmold outline of a ceremonial house, and was attributed to the Late Woodland Cole culture (USACE, 1974). A multicomponent site below the dam yielded artifacts of the Paleo-Indian, Archaic, Adena, Hopewell, Cole and Fort Ancient cultures, and the statement concludes that nearly every prehistoric group of the Ohio Valley is represented in the Paint Creek valley (USACE, 1974). The investigators found no record of historic Indian activity in the project area, though a major Shawnee village stood north of Greenfield (USACE, 1974).
One mound, known as the Plum Run Mound, sat on government land 1.8 miles northeast of Rainsboro, 90 by 70 feet at the base and up to 7.7 feet high, reported by a local resident to have once stood "about 10 feet high" (USACE, 1974). It was accepted to the National Register of Historic Places in 1972 but delisted in 1978 after investigators determined it was a natural erosional feature rather than a cultural one, a rare reversal of an NRHP listing (USACE, 2023).
By the time the project's land was surveyed for acquisition, the valley's built landscape was mostly farms: an architectural survey found buildings "primarily of the 1860-1920 period, rather substantial Victorian brick and frame structures, and barns of the same vintage," along with early cemeteries, two log buildings, and many already-demolished houses, barns and outbuildings (USACE, 1974). The statement adds that the region was once more "industrialized" than it became, and that "Rapids Forge and several early milling operations on Paint Creek," whose traces are gone, were important to the early economy (USACE, 1974). The surveyors found no mill or other industrial remains inside the survey area, though mills appear on early township maps (USACE, 1974). The road that runs south from Greenfield along the creek is still called Rapid Forge Road, and the 1974 dedication was billed as taking place at the dam "just seven miles south of Greenfield on Rapid Forge Road" (Times-Gazette, 2026).
Building the dam
Paint Creek's dam was authorized by the Flood Control Act of 1938 as part of the comprehensive flood-control plan for the Ohio River basin (USACE, 1974). A 1938 newspaper item put the project's cost at $3,835,000 (Circleville Herald, 1938), but the plan stalled for decades. A 1951 Scioto basin cost list put Paint Creek Reservoir at $11,000,000 (Circleville Herald, 1951), and that March Army engineers found the project's annual cost, $634,100, impractical at the time (Record-Herald, 1951). Major floods in the basin in 1913 and again in 1959 led Congress to order a new study (USACE, 2023), published as House Document 587 of the 87th Congress, which added recreation to the project (USACE, 1974). Water supply and water quality were added in March 1970 with the approval of the chairman of the Senate appropriations subcommittee on public works (USACE, 1974). The Corps approved its hydrology and site-selection memoranda in 1964 and its general design memorandum in March 1965, and construction began in 1967 (USACE, 2023).
The flood the dam was built to tame arrived while it was still on paper. The highest stage in 41 years of record at the U.S. Geological Survey gauge at Bourneville was 20.50 feet, with a discharge of 56,000 cubic feet per second, on March 10, 1964, and the creek stayed above damage stage for seven days (USACE, 1974).
The Corps' final environmental statement, published in July 1974, gives the fullest picture of what the taking cost the valley: 10,200 total acres, 80 percent of it cropland, 11 percent pasture, and just over 1 percent homesites (USACE, 1974). Ninety-eight sets of residential and farm improvements, one quarry and two commercial establishments were acquired, at an estimated average of $10,160 per residential or farm property, displacing an estimated 350 residents (USACE, 1974). The taking cost Highland and Ross Counties an estimated $33,500 a year in property tax revenue, and removed farmland worth an estimated $825,000 a year in agricultural income, more than 3.4 percent of Highland County's total (USACE, 1974). The statement repeatedly cites an unpublished August 1973 report, "Historical Analysis of the Paint Creek Lake Project Area," by a researcher named Kitchen, as its source on the valley's history (USACE, 1974).
Three cemeteries stood in the project area (USACE, 1985). One, holding roughly 50 graves, was threatened by flooding, and the Corps' 1985 master plan says the purchase and development of reinterment sites was considered; the other two sat on higher ground within the acquisition line (USACE, 1985). The 1974 statement says only that "some small cemeteries have been relocated" (USACE, 1974).
Before the dam, the valley's road pattern ran mostly north-south along the uplands, and there were no road crossings of Paint Creek between the dam site and Greenfield because the creek formed the county line (USACE, 1974). Three paved state secondary highways crossed land below the top of the flood-control pool (USACE, 1974). Building the dam meant about 6.4 miles of highway relocated, 0.2 mile raised in place, 1.1 miles left to flood now and then, 9 miles abandoned and five new bridges built; 8.8 miles of new power line strung and 6.5 miles removed; and 4.9 miles of telephone line built while 6.6 miles came down (USACE, 1974). Upstream, the Greenfield sewage treatment plant got phosphate-removal equipment, a relocated stretch of Paint Creek channel, a levee to protect the plant from flooding and a new 16-inch gravity sewer line, and the town's 36,000-gallon water-supply suction well was reworked (USACE, 1974). The Detroit, Toledo and Ironton Railroad's track was raised along its existing route (USACE, 1974). Roughly 310 acres of timber below the planned pool elevation were cleared and the merchantable timber sold, though some coves were deliberately left uncleared and rock was placed to improve fishing (USACE, 1974).
Construction finally closed the dam and impounded water in March 1974, and the reservoir reached its normal summer pool by May of that year (corpsdams.org). As of June 1, 1974, the Corps reported the project essentially complete at an estimated cost of $25,400,000, with land acquisition, relocations, pool clearing, the dam, its intake and outlet works and the Rattlesnake Creek and Taylor Road recreation areas finished (USACE, 1974). That is very close to the roughly $26 million total given by the Corps' cooperating association (corpsdams.org). The project was officially dedicated to the public on June 14, 1974 (USACE, 2023).
On paper the project paid for itself twice over: a benefit-cost ratio of 2.0 to 1 at 3.125 percent interest, against annual costs the Corps put at $1,294,200 in 1973 prices (USACE, 1974). Recreation was expected to return about $323,700 a year and hunting and fishing $73,700, and the Corps estimated that visitor spending would eventually support 82 to 110 jobs (USACE, 1974).
Stories
A burial under the bulldozer
In June 1970, workmen grading the dam area struck human remains just below the topsoil, and a member of the Ohio Historical Society's archaeology division was called to the site (USACE, 1974). The burial lay semiflexed in a shallow grave at the 860-foot elevation on a hill, with triangular points, a broken pendant, a turkey-bone awl and cut antler flakers, which identified it as Fort Ancient (USACE, 1974). No other burials were found nearby, and the statement records that the site "is now completely destroyed" (USACE, 1974).
Caves under the dam
The limestone that makes the valley scenic also made it hollow. The dam-site rock showed long-term solution, with cavern development at the intake structure near creek level and a series of caves in the gorge near the dam's axis at elevation 780 (USACE, 1974). The statement compares them with the Seven Caves resort on Rocky Fork, south of the project, which it calls "the largest cavern complex known in Ohio," formed at the same time in the same rock, and notes that the dam-site caves did not compare in size or commercial value (USACE, 1974).
The Seven Caves, older than the dam by a century
The Seven Caves sit in the Rocky Fork gorge about 6 miles west of Bainbridge, a mile south of U.S. 50 on Cave Road, on a Paint Creek tributary the dam did not block (Arc of Appalachia; USACE, 1974). ODNR says the caves drew visitors as early as the mid-1800s (ODNR, Rocky Fork State Park), and by the 20th century a landowner named Chaney had built the site into a commercial attraction, improving the road, clearing trails, cutting rock steps, wiring electric lighting into the caves, and raising admission from a dime to 25 cents (Ohio Traveler). Decades of souvenir hunters stripped the caves' ceilings of nearly all of their stalactites before the site was protected (Ohio Traveler). The nonprofit Arc of Appalachia bought 47 acres of the 60-acre 7 Caves park in 1995 and the remaining 13 in 2005, and folded it into its 3,000-acre Highlands Nature Sanctuary (Arc of Appalachia). Five of the caves have been restored as hibernation sites for endangered bats, while two, Marble Cave and McKimmie's Cave, open for public viewing from July through November (Arc of Appalachia).
A carp that predates the lake
Ohio's state-record common carp, a 50-pound fish caught by Judson Holton of Chillicothe on May 24, 1967, is credited simply to "Paint Creek" (WDTN). Since the dam had not yet closed and the lake didn't fill until 1974, that record fish, if it really was caught on the stretch that became the lake, was pulled from the free-flowing creek years before any reservoir existed there (USACE, 2023).
The highest sediment yield ever measured in Ohio
Before the dam went in, Paint Creek carried more sediment, mile for mile, than any other stream measured in the state: "Paint Creek measured at Bourneville has the highest sediment yield measured in Ohio" (USACE, 1974). The Ohio Division of Water's 1957 water-year figure put it at 407 tons per square mile; a six-year average from 1956 to 1962 measured 357 tons per square mile, against a statewide norm generally under 200 (USACE, 1974). Engineers attributed it to the valley's rolling, deeply cut terrain and loose glacial soils (USACE, 1974).
A farm from 1810
By the mid-1980s the state was rebuilding the past the lake had cleared away. The Corps' 1985 master plan describes Pioneer Farm, where the Ohio Department of Natural Resources reconstructed farm buildings "of 1810 vintage" in a grouping visitors could tour and help work, about midway between the mouths of Rattlesnake Creek and Plum Run (USACE, 1985). The plan credits the farm with a jump in the popularity of the park's interpretive programs (USACE, 1985).
The lake since
The 1974 statement expected the Ohio Department of Natural Resources to assume management of the state facilities beginning in 1975, with a lodge and cabin area among the proposals (USACE, 1974). A newly finished beach was dedicated in 1985 with officers of ODNR and the Ohio National Guard in attendance, according to the Greenfield Daily Times (Times-Gazette, 2026).
Visitor counts soon outran the Corps' early estimate. Its 1965 estimate was 250,000 visitors a year at first and 575,000 eventually (USACE, 1974). By the 1985 master plan, counted visitation had swung from a low of 1,032,582 in 1979 to a high of 2,256,671 in 1982, led by sightseeing, fishing, boating, hiking and picnicking (USACE, 1985). Overnight stays at the 199-site campground hit a low of 18,045 in 1978 and nearly doubled by 1982, and winter use climbed after 15 miles of snowmobile trails opened in the late 1970s and saugeye stocking improved winter fishing (USACE, 1985). The Corps' 2023 plan, using different counting methods, gives 585,363 visitors in 2014 and 259,545 in 2020, with July the busiest month at about 15 percent of the year's total (USACE, 2023).
The park today has a hilltop campground of 197 full-hookup sites, two camper cabins, a 10-site equestrian camp with 25 miles of bridle trails, a 100-slip marina with room for 132 boats, a 1,000-foot beach, a 21-hole disc golf course, 12 miles of mountain-bike trail and an archery range (USACE, 2023). The Corps' own downstream area offers rock climbing on the Harmony trail wall and the spillway wall and an ADA-accessible fishing pier below the dam (USACE, 2023). Several low rock dams built below the dam make the tailwater a fishery of its own (ODNR Division of Wildlife). The lake has also become a hub for community events, including a 2025 "Operation Fish with a Hero" outing for veterans and their families hosted at the park (Scioto Post, 2025).
The dam has been doing the job it was built for. The Corps credits it with preventing more than $20 million in flood damages in fiscal 2021 alone and more than $293 million since construction (USACE, 2023); its cooperating association gives $342 million to date (corpsdams.org). Releases are held within the downstream channel's capacity, 5,900 cubic feet per second in winter but only 4,600 in summer "in deference to cropping on extremely low bottom lands" (USACE, 1974). The highest pool in the public gauge record since 2020 is 834.58 feet on April 8, 2025, more than 36 feet above summer pool (NOAA gauge PCRO1; USACE, 2023).
Water quality has been a persistent theme. A 2006 Ohio EPA study, published as a formal pollution-reduction plan in 2012, found the creek's upper, agricultural watershed running below average for water quality, while the stretch closer to the dam tested as high-quality, exceptional warm-water habitat, and the lake itself fully met recreational standards at the time (USACE, 2023). More recent state assessments paint a tougher picture: as of the Corps' 2023 planning documents, the Paint Creek mainstem below Rocky Fork is listed as impaired for its warm-water fishery, for primary-contact recreation, for general recreation because of E. coli, and for human health and fish consumption because of PCBs (USACE, 2023). Harmful algal blooms have occurred on the reservoir in July 2013 and again in 2021, and on the adjacent Little Pond recreation area in 2017, though none has forced a lake closure (USACE, 2023).
The water
Unlike some of the other Corps reservoirs in the region, Paint Creek Lake carries an authorized water-supply purpose, and that authorization sees real use: Highland County draws its public water supply from wells rather than a direct lake intake, but three of those wells sit on U.S. Army Corps of Engineers property, installed in 1990 under a 50-year easement due to expire around 2040 (USACE, 2023).
The lake drains roughly 573 square miles of the Paint Creek watershed, a Scioto River tributary that sits geologically on the boundary between carbonate and sandstone aquifer rock (USACE, 2023). The watershed is about 70 percent agricultural and 20 percent forested (USACE, 2023). Ohio's Scenic Rivers Program has proposed 81.7 miles of Paint Creek and its tributaries for scenic-river designation (USACE, 2023). The pool is held at 798 feet from mid-April through September and drawn down 10.5 feet, to 787.5, between October 1 and November 30 to make room for winter floods; average depth is about 25 feet and water passes through in about 16 days (USACE, 2023).
Before the dam, fish diversity in the project streams was "generally low," mostly pollution-tolerant species, with Rattlesnake Creek cleaner than Paint Creek above their junction (USACE, 1974). The reservoir's dam blocks upstream fish migration on both Rattlesnake Creek and the upper mainstem, cutting off more than 500 square miles, nearly half of the entire Paint Creek basin, from species that once used it, leaving only the North Fork drainage, about a quarter of the formerly available habitat, still accessible (USACE, 1974). At least 18 migratory fish species once used the system, including muskellunge, several sucker species and carp (USACE, 1974). Today the impoundment itself supports largemouth, smallmouth and spotted bass, white bass, crappie, saugeye, catfish and carp (USACE, 2023). The Corps describes a 5,652-acre wildlife area at the upper end of the lake, managed by Ohio's Division of Wildlife for quail, pheasant, deer and waterfowl, and records osprey and bald eagles over the water (USACE, 2023); the state's own guide gives the wildlife area 5,090 acres and the park 5,934 (ODNR Division of Wildlife).
Sources
- U.S. Army Corps of Engineers, Huntington District: Final environmental statement, Paint Creek Lake, July 1974; Master plan update, Design Memorandum No. 16, 1985; Deer Creek and Paint Creek Lakes Regional Master Plan, June 2023 draft (also on Wikimedia Commons); draft statement record, NOAA repository
- National Inventory of Dams, OH00017; NOAA water gauge PCRO1
- Ohio Department of Natural Resources: Paint Creek Lake fishing map, 2010; Paint Creek Lake Wildlife Area, Publication 211
- National Park Service: Seip Earthworks; Hopewell Culture National Historical Park
- Paint Creek Lake Dam, Scioto Area Corps Cooperating Association; Paint Creek State Park marker, hmdb.org
- Highlands Nature Sanctuary, Arc of Appalachia; Cave Canyon in Ohio, Ohio Traveler
- Newspapers: Circleville Herald, May 20, 1938; Circleville Herald, February 21, 1951; Washington Court House Record-Herald, March 21, 1951; Times-Gazette history columns (May 2026, June 2026); Scioto Post, 2025; WDTN, record fish
Fishing and depth maps
Free PDF maps of Paint Creek Lake with depth contours, ramps and docks, each credited to the agency that published it. Not for navigation.
- Paint Creek Lake Ohio Department of Natural Resources, lake last surveyed 1999, map revised 2010 · PDF, 0.6 MB
Timeline
35 dated newspaper stories, reports and records about Paint Creek Lake, 1910 to 2026, each linked to its source.
Show all 35
- The People's defender. (West Union, Adams County, Ohio), 1910-06-02 West Union People's Defender
- The People's defender. (West Union, Adams County, Ohio), 1912-06-06 West Union People's Defender
- The People's defender. (West Union, Adams County, Ohio), 1913-04-17 West Union People's Defender
- The People's defender. (West Union, Adams County, Ohio), 1914-06-11 West Union People's Defender
- The People's defender. (West Union, Adams County, Ohio), 1914-11-12 West Union People's Defender
- The People's defender. (West Union, Adams County, Ohio), 1915-05-13 West Union People's Defender
- The People's defender. (West Union, Adams County, Ohio), 1918-08-01 West Union People's Defender
- The People's defender. (West Union, Adams County, Ohio), 1921-05-05 West Union People's Defender
- Frankfort Sun, 1921-11-17 Chillicothe & Ross County Public Library Digital Newspaper Collection
- Frankfort Sun, 1922-07-27 Chillicothe & Ross County Public Library Digital Newspaper Collection
- Frankfort Sun, 1923-04-26 Chillicothe & Ross County Public Library Digital Newspaper Collection
- Frankfort Sun, 1923-05-03 Chillicothe & Ross County Public Library Digital Newspaper Collection
- Frankfort Sun, 1923-05-10 Chillicothe & Ross County Public Library Digital Newspaper Collection
- Frankfort Sun, 1923-05-24 Chillicothe & Ross County Public Library Digital Newspaper Collection
- Frankfort Sun, 1923-06-21 Chillicothe & Ross County Public Library Digital Newspaper Collection
- Frankfort Sun, 1923-06-28 Chillicothe & Ross County Public Library Digital Newspaper Collection
- Frankfort Sun, 1923-08-02 Chillicothe & Ross County Public Library Digital Newspaper Collection
- Frankfort Sun, 1923-09-06 Chillicothe & Ross County Public Library Digital Newspaper Collection
- Frankfort Sun, 1923-10-04 Chillicothe & Ross County Public Library Digital Newspaper Collection
- Frankfort Sun, 1924-02-21 Chillicothe & Ross County Public Library Digital Newspaper Collection
- Federal Flood Control Program Includes Deer Creek Reservoir (also names Paint Creek Reservoir) The Circleville Herald
- Scioto basin flood-control cost breakdown published The Circleville Herald
- Conservancy Plans Receive Jolt Washington C.H. Record-Herald
- Record fish and where they were caught in Ohio WDTN
- Environmental Statement Paint Creek Lake, Paint Creek, Scioto River Basin, Ohio (Draft) Ohio Sea Grant College Program / NOAA repository
- National Day of Prayer to be held (retrospective item: 1974 Paint Creek Lake dedication) The Press-Gazette via The Times Gazette "this week in history" retrospective col
- Whiskey still found in old theater (retrospective item: 1985 Paint Creek Lake beach dedication) The Greenfield Daily Times via The Times Gazette "this week in history" retrospe
- What might have been The Times Gazette
- ODNR: Swim safely this summer The Times Gazette
- Paint Creek State Park temporarily renamed Times Gazette
- Paint Creek and Deer Creek Lakes Regional Master Plan & Integrated Environmental Assessment (draft) U.S. Army Corps of Engineers, Huntington District
- Cousins reunion held at Paint Creek Lake Dam Times Gazette
- Paint Creek at Paint Creek Lake Pool / Paint Creek below Paint Creek Dam at Bainbridge NOAA water.noaa.gov gauge pages
- Paint Creek Lake to Host 'Operation Fish With a Hero' for Veterans and Families Scioto Post
- Three kittens rescued from freezing temperatures at Paint Creek State Park Times Gazette
Towns and ZIP codes around Paint Creek Lake
Water, health, jobs and history for the places on the shores and just downstream.
Towns
ZIP codes
Questions
When was Paint Creek Lake built?
Paint Creek Dam was authorized by the Flood Control Act of 1938. Construction did not begin until 1967, the dam closed and first impounded water in March 1974, the lake reached its normal summer pool that May, and the project was officially dedicated to the public on June 14, 1974.
How many people were displaced by Paint Creek Lake?
The Corps' final environmental statement estimated 350 residents on the project's 10,200 acres, with 98 sets of residential and farm improvements, one quarry and two commercial properties acquired. Average compensation for a residential or farm property was estimated at $10,160.
What towns are under Paint Creek Lake?
No platted village lies inside the flood pool. What the lake took was a farm valley: buildings mostly from 1860 to 1920, two log buildings, early cemeteries, and dozens of prehistoric sites, 13 of them now recorded as submerged. The Corps' environmental statement names Rapids Forge and several early mills as once important to the area's economy, but says their traces are gone and does not place them inside the lake.
How tall is Paint Creek Dam?
Paint Creek Dam is a rolled-rock embankment with a central earth core, 118 feet above the streambed (164 feet above its foundation cutoff) and about 700 feet long at the crest, which sits at elevation 864 feet. The National Inventory of Dams lists it as high hazard.
Is Paint Creek Lake a drinking water source?
Highland County draws its public water supply from wells rather than a direct lake intake, but three of those wells sit on U.S. Army Corps of Engineers property near the reservoir, installed in 1990 under a 50-year easement.
How big is Paint Creek Lake?
The Corps gives about 1,190 acres at the April-through-September summer pool elevation of 798 feet, with roughly 29.7 miles of shoreline and a 573-square-mile drainage area. The state fishing map, revised in 2010 from a 1999 survey, gives 1,178 acres of water and 27.7 miles of shoreline.
Are there Hopewell earthworks near Paint Creek Lake?
Yes, downstream. The Corps' environmental statement notes five major Hopewell earthwork complexes in the six miles between Bainbridge and Bourneville, built roughly 300 B.C. to A.D. 400. One of them, Seip Earthworks, is part of the Hopewell Ceremonial Earthworks World Heritage Site. The lake area itself holds smaller sites: mounds, camps and villages, several excavated before the water rose.
How many people visit Paint Creek Lake?
The Corps estimated in 1965 that the lake would draw 250,000 visitors a year at first and 575,000 eventually. Counted visitation ran from 1,032,582 in 1979 to 2,256,671 in 1982, and the Corps' 2023 plan gives 585,363 visitors in 2014 and 259,545 in 2020, under different counting methods.
Has Paint Creek Lake had harmful algal blooms?
Yes. The Corps records blooms on the lake in July 2013 and 2021 and one on the adjacent Little Pond in 2017. None forced a closure, and warning signs were posted at Little Pond.