Ohio lakes · Muskingum County

Dillon Lake

Dillon Dam closed the Licking River near Zanesville in July 1959, taking 13,079 acres, 19.5 miles of railroad, a school and 8 cemeteries.

  • Built 1960
  • 1,560 acres
  • Licking River
  • U.S. Army Corps of Engineers, Huntington District
  • Published , updated

Summer temperature by depth

Only 2 summer temperature profiles with depth have been found for Dillon Lake (1977-2009), too few to say what is typical. Those profiles put the thermocline about 14 ft down.

Past measurements, not live readings: U.S. Army Corps of Engineers / Water Management, 1 profile 2009; USGS Ohio Water Science Center, 2 profiles 1977. From the Water Quality Portal, the EPA National Lakes Assessment and the Army Corps' lake records.

At a glance

FactValue
BuiltAuthorized by the Flood Control Act of 1938; dam closure completed July 1959 (USACE, 1977); floods regulated from 1960 (USGS); "completed in 1961" (USACE, 1971)
Location of damLicking River, 5.8 miles above its mouth and 83.4 miles above the mouth of the Muskingum (USACE, 1977)
DamRolled earthfill with impervious core, 118 ft high, 1,400 ft long, 30 ft wide at top, 1,040 ft at base (USACE, 1977)
SpillwayUncontrolled, partly concrete-lined, crest elevation 790, 292 ft long, design discharge 89,700 cfs (USACE, 1977)
Outlet worksThree sluices with 8 x 16 ft gates into a 20-ft conduit, plus two 42-inch minimum-pool conduits (USACE, 1977)
DikesNashport Dike, 8.5 mi northwest, 48 ft high, 1,600 ft long; Pleasant Valley Dike, 3.5 mi north, 38 ft high, 1,420 ft long (USACE, 1977)
PoolsMinimum 734 ft, 1,330 acres; summer 737 ft, 1,560 acres; maximum 790 ft, 10,280 acres and 21.7 miles of backwater (USACE, 1977)
Storage17,500 acre-feet at summer pool; 274,000 acre-feet at elevation 790 (USACE, 1977)
Water area on the state fishing map1,279 acres, 27.9 miles of shoreline, from a 1999 survey (ODNR, 2009)
Drainage area742 square miles (USACE, 1977)
Land acquired7,797.2 acres in fee plus 5,281.7 acres of flowage easement (USACE, 1977)
Relocations19.5 mi of B&O track, 14.4 mi of state and county road, Nashport School, 8 cemeteries with 161 graves (USACE, 1977)
Cost$30,218,100 construction (USACE, 1977); $6.5 million for the dam, $31 million with railroad and highway relocation (Columbus Dispatch)
ContractorS.J. Groves & Sons Co., 1959 (Columbus Dispatch)
Flood of record at dam site47,000 cfs, January 22, 1959 (USACE, 1977)
Largest regulated peak below dam7,670 cfs, January 29, 2005 (USGS)
Record pool788 ft, January 2005 (Farm and Dairy, 2005); 771.51 ft on February 26, 2022, highest since the public record began in 2020 (USACE CWMS)
Flood damages preventedAbout $19 million by 1970 (USACE, 1971); over $1 billion since construction (USACE, 2020)
VisitorsMore than 1,040,000 in 1969 (USACE, 1971); 970,334 in 1971 and 908,316 in 1974 (USACE, 1977)
State park2,285 acres, 29 cabins, 195 campsites, 1,360-ft beach (ODNR, 2020)
OperatorU.S. Army Corps of Engineers, Huntington District (USACE, 2020)
CountyMuskingum (USACE, 1977)
NID IDOH00007 (NID)

Before the lake

Dillon Lake takes its name from Moses Dillon, who first saw the falls of the Licking River around 1803 or 1804, when, at about 70, he traveled through as the companion of a Quaker minister visiting the Wyandots (Everhart, 1882). He found iron ore nearby, went home to Pennsylvania, bought a tract of perhaps 3,000 acres including the falls, and moved there in 1805 (Everhart, 1882). The county's 1882 history says the iron furnace and foundry he built there, making hollow-ware, was "probably the first furnace and foundry erected west of the Allegheny Mountains" (Everhart, 1882). In 1806 he opened a store at the falls that traded with Native people still in the area, exchanging clothing and ammunition for skins, furs and meat (Everhart, 1882). In 1814 he added a gristmill and two sawmills, and the mills and furnace at times employed as many as 150 men (Everhart, 1882). The village that grew up on his land was never formally laid out, and nobody but Dillon held title to the lots, yet it once numbered fifty families (Everhart, 1882).

Moses Dillon worked with his sons John, Isaac and Moses until near his death in 1828, at 94 (Everhart, 1882). His son John kept the furnace, foundry and mills going and became the first president of the Muskingum County Agricultural Society when it organized in 1836 (Everhart, 1882). The Ohio Department of Natural Resources credits Moses Dillon with the design and construction of Zanesville's Y-Bridge (ODNR, 2020). The county history also passes on a family story about the first dam at Zanesville: Isaac Zane built it with borrowed money on his father's promise of a half interest, and the elder Zane then sold it to Moses Dillon and Sons and rode home to Wheeling with the money (Everhart, 1882).

A 1910 U.S. Geological Survey map shows the village, labeled simply "Dillon," on the Licking River at a benchmark of 712 feet, with the Baltimore and Ohio Railroad and the Ohio, Licking and Electric interurban line running through it (USGS, 1910). That spot lies about two miles downstream of the dam site, near the gauge the Survey still calls "Licking River below Dillon Dam near Dillon Falls" (USGS). The reservoir backs water up to 21.7 miles up the valley above the dam (USACE, 1977), so the old village sits below the lake rather than under it.

Upstream, the reservoir reaches into Licking Township, which in 1880 held five school districts, a single water-powered mill and two villages, Irville and Nashport (Everhart, 1882). John Irvine and a partner named Ayers laid out Irville in 1815, near a Methodist church organized about 1812 with fifteen members (Everhart, 1882). Jared Brush opened a store there in a hewed-log house in 1818, and Nathan Fleming's store of 1825 was remembered as the township's first regular one (Everhart, 1882). By 1880 Irville had one store, one tavern, a blacksmith shop and two shoe shops (Everhart, 1882). Nashport, named for Capt. Thomas Nash, was laid out on 40 acres in 1827 and by 1880 had about three hundred people, two stores, a church and a public school (Everhart, 1882). The Ohio Canal reached it in 1830; the first boat through, on July 4 that year, was the pleasure boat Reindeer from Newark (Everhart, 1882).

All three names, Irville, Nashport and Pleasant Valley, appear in the title of a 169-page book the Muskingum County Chapter of the Ohio Genealogical Society published in 2022, "Before Dillon: Memories of the Lost Villages of Irville, Nashport, and Pleasant Valley" (MCCOGS). Rose Ellen Jenkins, who compiled it from family photographs and interviews gathered from the spring of 2019 through most of 2020, said, "This is so many people's history, but when they are gone the history will be gone" (Y-City News, 2022).

Nashport Mound, listed on the National Register of Historic Places on April 23, 1973, is the only one of the Muskingum basin's 95 National Register sites on federal land immediately next to one of the basin's lake projects (USACE, 1977). The Corps found that operating the dam might affect the mound's scientific value, and a 1973 Memorandum of Agreement among the Huntington District, the national Advisory Council and Ohio's State Historic Preservation Officer covers how that is handled (USACE, 1977).

Building the dam

The Muskingum basin flooded severely at least five times in the late 1800s, but nothing was done until the March 1913 flood caused $14 million in losses across the basin (USACE, 1977). That flood led to Ohio's 1914 Conservancy Act and the Muskingum Watershed Conservancy District's fourteen 1930s dams (USACE, 1977). The Licking River below the dam site peaked at an estimated 39,000 cubic feet per second in 1913 (USGS). Dillon is a separate, later federal project: the Flood Control Act of 1938 authorized it, work did not begin until after World War II, and the Korean War delayed its completion until 1960 (USACE, 1977). Clifton Kilpatrick, the Corps' project manager in 2013, said the 1913 flood and those after it "brought about the Dillon dam" (WHIZ, 2013).

The Corps' own project sheet puts the land acquired at 7,797.2 acres bought outright and 5,281.7 acres in flowage easement, a total of 13,078.9 acres (USACE, 1977). It lists the relocations: 19.5 miles of main-line track and three bridges for the Baltimore and Ohio, 7.7 miles of state highway and 6.7 miles of county roads with five bridges, 32.7 miles of power lines, 34.2 miles of telephone and telegraph lines, 17.2 miles of pipelines, the Nashport School, and eight cemeteries with 161 graves (USACE, 1977). Construction cost $30,218,100, and dam closure was completed in July 1959 (USACE, 1977).

A Columbus Dispatch aerial from May 17, 1956, looks toward Zanesville over the site of the dam "which would form reservoir in Licking valley," with the old tracks along the river and the new right-of-way visible to the right (Columbus Dispatch). Another from the same day shows piers for a new railroad trestle across the Licking, captioned "New tracks will be at a higher elevation" (Columbus Dispatch). A third shows the tree-shaded Main Street of Nashport, "which would have to be abandoned or relocated because it lies within the flood reservoir area" (Columbus Dispatch). Nashport was not abandoned; the relocation the Corps itself recorded there was the school (USACE, 1977), and the 2022 book's compiler told a Zanesville audience that the old Nashport School was demolished to make way for the dam (Y-City News, 2022).

Irville Cemetery's record states that "161 bodies were removed from 8 cemeteries and relocated to the Irville and Timber Run Cemeteries" when the dam was built, from one burial ground in Hopewell Township and others in Licking Township (Find a Grave). The Hopewell Township one was Bonifield Cemetery, moved in 1959 to Timber Run Cemetery "in a section set apart by itself," the only cemetery in that township moved for the project (Muskingum County USGenWeb).

The two dikes show how far the taking reached: the Nashport Dike closes a low point in the north rim 8.5 miles northwest of the dam, and the Pleasant Valley Dike does the same 3.5 miles north (USACE, 1977). The dam's outlet sends water through three sluices, each controlled by an 8-by-16-foot gate, into a 20-foot conduit and a stilling basin (USACE, 1977). A November 5, 1959, Dispatch photograph of the intake structure credits the work to S.J. Groves & Sons Co. "with flood control funds" (Columbus Dispatch). A later Dispatch caption said the dam itself cost $6.5 million and the whole project, "including relocation of railroad and highways," $31 million (Columbus Dispatch).

On January 22, 1959, months before closure, the Licking at the dam site ran 47,000 cubic feet per second, the flood of record there (USACE, 1977), and the gauge at Toboso, above the lake, peaked at 49,800 (USGS). Dispatch photographers recorded the damage upstream on Hollander Street in Newark three days later (Columbus Dispatch). From 1960 on, every annual peak at the gauge below the dam is flagged as affected by regulation (USGS). The Corps' 1971 summary describes the project as "completed in 1961" at an estimated total cost of $30,600,000 (USACE, 1971). The National Inventory of Dams lists 1960 (NID).

Stories

A covered bridge lost in 1959

The Pleasant Valley Covered Bridge, catalogued as Ohio covered bridge 35-60-30, was a two-span bridge with a 90-foot Queen post truss and a 150-foot Smith truss (Columbus Metropolitan Library). A Zanesville postcard captioned "Lost in the 1959 Flood" says it stood "on the part of the Licking River that is now in the Dillon Dam flood control" pool, and credits the photograph to Joe McElroy (Columbus Metropolitan Library). A second card from the same Hivnor publisher repeats the story (Columbus Metropolitan Library). The name survives in Pleasant Valley Road, where the Dillon Sportsman Center now runs public rifle, pistol, skeet and trap ranges at number 5200 (ODNR, 2020).

The village the lake did not drown

It is easy to assume the lake covered the village it is named for. The 1910 survey map puts "Dillon" at the falls about two miles below the dam site, on the railroad and interurban line (USGS, 1910). What the reservoir did take was upstream of the falls: Licking Township's river bottoms, the B&O line, the Nashport School and the graveyards (USACE, 1977).

Diplomats on a dam tour

One March 17, soon after the dam was finished, more than thirty military officers from 21 Latin American countries, members of the Inter-American Defense Board, flew into Zanesville on an Air Force transport to see the "newly completed" dam (Columbus Dispatch). Col. Steven Malevich, chief of the Huntington District, escorted them (Columbus Dispatch). From Zanesville they flew on to Louisville, circling over the Roseville flood-control project and viewing the Greenup Dam on the Ohio from the air, and ended the tour at Tullahoma, Tennessee (Columbus Dispatch).

Ohio's "Blackhand" the canal builders blew up

In Blackhand Gorge, now a state nature preserve on land leased from the dam project, a sandstone cliff once bore a soot-blackened engraving of a human hand, thought to have guided travelers toward the flint outcrops of Flint Ridge (ODNR, 2020) (USACE, 2020). Flint from Flint Ridge has been found as far east as the Atlantic coast, as far south as Louisiana and as far west as Kansas City (ODNR, 2020). The engraving was destroyed in 1828 when the cliff was blasted for the Ohio and Erie Canal, and the gorge still holds a canal lock, an abandoned interurban tunnel, a railroad cut and an old sandstone quarry (Historical Marker Database). In the 1970s the Corps and ODNR planned a 22-mile hiking and biking trail from Dillon State Park through the Dillon State Wildlife Area to the gorge, part of a 110-mile North Central Bikeway from Mt. Gilead to McConnelsville, at an estimated $369,000 (USACE, 1977).

Price's Rocks and a bog in a strip mine

The Corps' 1977 review lists two unusual natural areas within the Dillon project, Price's Rocks and the 2,696-acre Powelson Wildlife Area north of Zanesville, where sphagnum moss grows in old strip-mine ponds and drainages (USACE, 1977).

The lake since

The Ohio Department of Natural Resources leases the land around the lake from the federal government and runs the recreation facilities (USACE, 1977). Administration of all project land except what the Corps needs for operations, including four recreation sites the Corps had built, was transferred to the state (USACE, 1971). Dillon Lake State Park was developed in part with federal Land and Water Conservation Fund money, project 39-00003 (USACE, 1977). The park covers 2,285 acres, with 29 cabins, 183 electric and 12 non-electric campsites, 20 equestrian sites and a 1,360-foot beach (ODNR, 2020). The lake allows unlimited horsepower, and the marina leases 95 seasonal docks (ODNR, 2020). The park lists 19 miles of bridle trail, 18 miles of mountain-bike trail and 8.9 miles of hiking trail (ODNR, 2020). The Corps' other outgrants include the Village of Hanover, a marina concession, Zane State College's natural resource center and the sportsman's center (USACE, 2020).

The Corps counted more than 1,040,000 visitors at Dillon Lake in 1969 (USACE, 1971). Its 1977 environmental statement, tallying visits by activity, gave 970,334 in 1971 and 908,316 in 1974, a drop of about 6 percent (USACE, 1977). By 2019 Dillon State Park had hosted the Midwest Scholastic Rowing Association's championships for six years, and a local co-ed rowing team was being organized that fall through the visitors bureau, the Boy Scouts and Grace United Methodist Church (Y-City News, 2019). In 2018 the association's director put the rowing community's value to the Zanesville area at roughly $500,000, while the course's operations manager said silt had cut depths to 2.5 feet in places against an ideal 8 feet (Y-City News, 2018). The Scholastic Rowing Association of America's 2019 national championships brought 36 high school teams and an estimated 10,000 to 12,000 spectators over Memorial Day weekend (Y-City News, 2019). The Corps' 2020 planning list of issues names sedimentation at the upper end of the lake first (USACE, 2020).

A Dispatch photograph dated March 8, 1963, shows the dam during the Licking River flood of 1963 (Columbus Dispatch). That month the river near Newark, above the lake, peaked at 30,400 cubic feet per second, while the largest flow let out below the dam was 7,320 (USGS) (USGS). The pool reached 772 feet in 1964, a record that stood until January 2005, when it rose to 788 feet against a normal winter level of 734 (Farm and Dairy, 2005). Farm and Dairy reported at least 100 acres of wheat fields under water near the dam that month, and Kilpatrick, then the Corps' resource manager, said "the dam is doing exactly what it was designed to do" (Farm and Dairy, 2005). The largest regulated release on the gauge below the dam came the same month, 7,670 cubic feet per second on January 29, 2005, about a sixth of the 1959 flood (USGS).

In February 2019 Muskingum County's emergency director said river levels had begun to fall in part because water was "completely blocked at Dillon Dam" while crests from Coshocton and Dresden moved south (Y-City News, 2019). On March 20, 2020, the Licking near Newark reached an estimated 45,400 cubic feet per second, above its January 1959 peak (USGS). Since the Corps' public pool record began in September 2020, the lake has peaked at 771.51 feet on February 26, 2022, and at 770.62 feet in April 2024 (USACE CWMS). The low in that record is 734.12 feet, on January 25, 2021 (USACE CWMS). By the Corps' 1971 count, flood-control benefits had reached about $19 million (USACE, 1971); by 2020 it put damages prevented since construction at over $1 billion (USACE, 2020).

The water

Dillon Lake's authorized purposes are flood control, recreation, fish and wildlife enhancement, and low-flow augmentation, with no water-supply purpose (USACE, 2020). It drains 742 square miles of the Licking River basin (USACE, 1977). Three tributaries from Muskingum County that flow into the lake run a combined 44 miles (Y-City News, 2018). The Corps' draft planning objectives allow the existing oil and gas wells at Dillon Lake to keep operating under their lease but rule out new mineral, gas or oil exploration on project land (USACE, 2021).

Water quality at the beach has been a recurring problem; the Corps lists "occasional closure of beach due to water quality issues" among the lake's needs (USACE, 2020). Dillon Lake joined Ohio's Clean Lakes program in 1987 as one of four water bodies the EPA studied that year (Y-City News, 2018). In August 2010, ODNR, Ohio EPA and the Ohio Department of Health told visitors to avoid a blue-green scum that a lab identified as Anabaena, a cyanobacteria that can produce toxins, while the park stayed open (Buckeye Lake Beacon, 2010). On May 31, 2018, E. coli levels high enough to "make people sick" brought a health department alert at the state park beach (Y-City News, 2018). Ohio EPA pointed to Newark's combined sewer overflows, which release untreated storm water and wastewater into the Licking in heavy rain, and to failing septic systems; Newark had received $64 million over a decade for sewer and storm-water work, and principal-forgiveness septic loans totaled $606,000 in Muskingum County, $856,000 in Licking and $550,000 in Fairfield (Y-City News, 2018).

The Licking River sub-basin, including Dillon Lake, supports 64 fish species (USACE, 1977). The Corps' 1977 review called the Licking below the dam one of the best spots in Ohio for muskellunge, walleye and largemouth bass (USACE, 1977). ODNR lists largemouth bass, bluegill, crappie, saugeye, hybrid striped bass and catfish in the lake (ODNR, 2020). Its fishing map shows 1,279 acres of water and 27.9 miles of shoreline at the summer pool of 737 feet, from a 1999 survey (ODNR, 2009). Federally listed species at the project include the Indiana bat, northern long-eared bat, and the fanshell, rabbitsfoot, sheepnose and snuffbox mussels (USACE, 2020). The lake holds one of two great blue heron nesting areas in southeastern Ohio, the Division of Wildlife stocks pheasants on project land, and diseased ash trees have had to be removed (USACE, 2020).

Sources

Fishing and depth maps

Free PDF maps of Dillon Lake with depth contours, ramps and docks, each credited to the agency that published it. Not for navigation.

  • Dillon Lake Ohio Department of Natural Resources, lake last surveyed 1999, map revised 2009 · PDF, 1.4 MB

Timeline

80 dated newspaper stories, reports and records about Dillon Lake, 1913 to 2026, each linked to its source.

Show all 80
  1. The 1913 flood that led to Dillon Dam WHIZ retrospective, quoting contemporary damage estimates
  2. Dillon Lake authorized as a Muskingum River Basin flood-control unit Federal Flood Control Act of 1938
  3. Main Street in Nashport, Ohio The Columbus Dispatch
  4. Aerial of future location of Dillon Dam The Columbus Dispatch
  5. Railroad trestle piers for new track The Columbus Dispatch
  6. Aerial of Dillon Dam site The Columbus Dispatch
  7. Licking River flooding at Newark and Utica The Columbus Dispatch
  8. Dillon Dam under construction The Columbus Dispatch
  9. Dillon Dam intake structure The Columbus Dispatch
  10. Dillon Dam Reservoir The Columbus Dispatch
  11. Dillon Dam dedicated as final unit of Muskingum Valley flood control Muskingum Valley Flood Control Program dedication
  12. Aerial view of Dillon Dam, Zanesville, Ohio Ohio University Libraries, Manuscripts Collection
  13. Dillon Lake Dam during flood of 1963 The Columbus Dispatch
  14. Dillon Lake The Columbus Dispatch
  15. Dillon State Park The Columbus Dispatch
  16. High water: Flooding is history in the making Farm and Dairy
  17. Mountain bikers flock to Dillon State Park Zanesville Times Recorder
  18. Dillon Soda Bandit Investigation WHIZ News
  19. Catfish tourneys at Dillon Lake Zanesville Times Recorder
  20. Monitoring Dillon Dam WHIZ News
  21. Dillon Falls Road Closing WHIZ News
  22. State issues cautions for activities at Dillon Lake The Buckeye Lake Beacon
  23. Advisory Cancelled for Dillon Lake WHIZ News
  24. Fire destroys RV at Dillon State Park campground Zanesville Times Recorder
  25. Dillon Lake, Now Home to Rowing Association WHIZ News
  26. Catfish tournaments returning to Dillon Lake Zanesville Times Recorder
  27. 1913 Flood = Dillon Dam WHIZ News
  28. Pair fall overboard, lose boat, Dillon Lake Zanesville Times Recorder
  29. Body of pizza delivery driver found at Dillon State Park, suspect arrested Zanesville Times Recorder
  30. Volunteers bring Dillon trails up to snuff Zanesville Times Recorder
  31. Championship regatta draws 2,000 rowers to Dillon State Park Zanesville Times Recorder
  32. Naturalist programs set at Blackhand Gorge, Dillon State Park Zanesville Times Recorder
  33. Dillon Falls Bridge used new building method Zanesville Times Recorder
  34. Dillon Falls Road to close on Friday Zanesville Times Recorder
  35. Dillon School Drive to close Tuesday Zanesville Times Recorder
  36. Part of Dillon Falls Road closing for work Zanesville Times Recorder
  37. Nature photography course at Dillon State Park Zanesville Times Recorder
  38. Dillon State Park Hosting Regatta National Championship WHIZ News
  39. Pipeline protest at Dillon Dam WHIZ News
  40. Boil advisory in Dillon Dam area lifted Zanesville Times Recorder
  41. ODNR to renovate more cabins at Dillon State Park Zanesville Times Recorder
  42. Dillon Dam and flood water control WHIZ News
  43. Warning issued to Dillon Lake swimmers Y-City News
  44. Contamination in Dillon Lake linked to several contributing factors Y-City News
  45. E.coli levels unpredictable at Dillon Lake Zanesville Times Recorder
  46. Rowing Association looking to put Zanesville on national map Y-City News
  47. EMA updates on flooding throughout county, area under flood advisory Y-City News
  48. EMA monitoring flooding as water from north flows toward Muskingum County Y-City News
  49. Dillon Lake Prepares For First Regatta Of The Year WHIZ News
  50. 1,200 rowers converging on Dillon Lake this weekend Zanesville Times Recorder
  51. National Rowing Championship at Dillon State Park WHIZ News
  52. More than 10,000 make their way to Dillon Lake for national rowing competition Y-City News
  53. It was a fun day at Dillon Lake WHIZ News
  54. Dillon State Park getting one, two new tornado sirens Zanesville Times Recorder
  55. Water main break leaves parts of Dillon without service Zanesville Times Recorder
  56. Dillon Falls Road closure WHIZ News
  57. Rowing team forming in Muskingum County Y-City News
  58. House Fire Near Dillon Displaces Family of Five WHIZ News
  59. Heavy rain closed many roads near Dillon Dam Zanesville Times Recorder
  60. Flooded Roads in Dillon Dam Area WHIZ News
  61. Dillon Falls Road Closure WHIZ News
  62. Dillon Falls Road closure WHIZ News
  63. Paving work on Dillon Falls Road WHIZ News
  64. Two Vehicle Accident Closes State Route 146 near Dillon Lake WHIZ News
  65. Local News Briefs: Friends of Dillon Park meeting Zanesville Times Recorder
  66. Safety improvements coming to intersection of Dillon Falls Road and Pinecrest Drive Y-City News
  67. Dillon School Drive closure WHIZ News
  68. Dillon State Park Resumes Public Events WHIZ
  69. Dillon State Park's 'Storybook Trail' Educates on Honeybees WHIZ News
  70. Book details history of lost communities from local Dillon Dam construction Y-City News
  71. Dillon State Park Hosts Christmas in July WHIZ News
  72. Lutz: man found dead at Dillon State Park Y-City News
  73. Dresden man found dead near Dillon State Park Zanesville Times Recorder
  74. Dillon State Park Halloween Campout 2022 WHIZ News
  75. Halloween Weekend at Dillon State Park WHIZ News
  76. Burr Oak and Dillon State Park Receive Funds WHIZ News
  77. Hikers Stroll Through Dillon State Park WHIZ News
  78. Dillon State Park Adds Inclusive Playground WHIZ
  79. Inclusive playground opens at Dillon State Park Zanesville Times Recorder
  80. Dillon State Park offers hikes and wildlife programs in January Zanesville Times Recorder

Towns and ZIP codes around Dillon Lake

Water, health, jobs and history for the places on the shores and just downstream.

Towns

ZIP codes

Questions

When was Dillon Lake built?

Dillon Dam was authorized by the Flood Control Act of 1938, but work did not begin until after World War II and the Korean War delayed it further. The Corps of Engineers completed dam closure in July 1959. The gauge below the dam shows the reservoir regulating floods from 1960, and Corps and state park literature give 1961 as the year the project was completed for operation.

What towns are under Dillon Lake?

No whole town lies under the normal pool. The Corps' relocation list for the project names 19.5 miles of Baltimore and Ohio Railroad track, 14.4 miles of state and county road, the Nashport School and 8 cemeteries with 161 graves. A local history book calls Irville, Nashport and Pleasant Valley the lost villages of the reservoir; Nashport is still an inhabited village. The old mill village of Dillon at Dillon Falls stands about two miles below the dam, not in the lake.

Was Nashport, Ohio flooded by Dillon Dam?

Not entirely. A 1956 Columbus Dispatch photo caption said Nashport's Main Street would have to be abandoned or relocated because it lay within the flood reservoir area, and the Corps' list of relocations names the Nashport School. Nashport itself survives, and the Nashport Dike, 48 feet high and 1,600 feet long, closes a gap in the reservoir rim 8.5 miles northwest of the dam.

What is under Dillon Lake?

The Corps relocated 19.5 miles of B&O main line and three railroad bridges, 7.7 miles of state highway, 6.7 miles of county road with five bridges, 32.7 miles of power lines, 34.2 miles of telephone and telegraph lines, 17.2 miles of pipelines, the Nashport School and 8 cemeteries holding 161 graves. The Pleasant Valley Covered Bridge, a 240-foot two-span structure, is recorded as lost in 1959 on the stretch of river now in the flood-control pool.

How tall is Dillon Dam?

Dillon Dam is a rolled earthfill embankment with an impervious core, 118 feet high, 1,400 feet long at the top, 30 feet wide at the crest and 1,040 feet wide at the base. Its uncontrolled spillway near the east abutment has a crest at elevation 790 and is 292 feet long.

Who owns and operates Dillon Lake?

The U.S. Army Corps of Engineers, Huntington District, owns and operates Dillon Dam for flood control, recreation, fish and wildlife enhancement, and low-flow augmentation. The Ohio Department of Natural Resources leases project land for Dillon State Park, Blackhand Gorge State Nature Preserve and a wildlife area.

How big does Dillon Lake get in a flood?

The Corps keeps a minimum pool at elevation 734 feet covering 1,330 acres and a summer pool at 737 feet covering 1,560 acres. At the spillway crest, elevation 790, the reservoir would cover 10,280 acres and back water 21.7 miles up the Licking. The highest pool reported is 788 feet, in January 2005.

Has Dillon Lake had algae or bacteria advisories?

Yes. In August 2010 Ohio agencies warned visitors to avoid a blue-green scum identified as Anabaena, a cyanobacteria that can produce toxins. The swimming beach has also had E. coli advisories, including one after high levels were found on May 31, 2018, linked in part to sewer overflows and failing septic systems upstream.

How many people visit Dillon Lake?

The Corps reported more than 1,040,000 visitors at Dillon Lake in 1969. Its 1977 environmental statement, using a different count, gave 970,334 visits in 1971 and 908,316 in 1974. Rowing has added crowds: by 2019 the park had hosted the Midwest Scholastic Rowing Association's championships for six years, and a 2019 national championship drew an estimated 10,000 to 12,000 spectators.

More Ohio lakes

See them all

Cite this page

Cite this page as:

Cracked Buckeye, "Dillon Lake", https://crackedbuckeye.com/lakes/dillon/, built 2026-11-14, accessed [date].

How to cite · Report a correction · Built 2026-11-14