Water system

Columbiana City

EPA ID OH1500312 · Columbiana County · 6,727 people served · owned by a local government

Groundwater wells (11 wells)
Groundwater

Columbiana City treats its own water from Groundwater wells (11 wells).

The system's record

Groundwater wells (11 wells)
Groundwater
Wells: EPA lists 11 active wells. ODNR well logs locate 8 public-supply wells inside Columbiana City's wellhead protection zone, 180 to 410 ft deep, in shale and sandstone. Zoom in to see them as dots.
Well 9Well 3Well 5Well 6Well 7Well 1Well 2Well 8Well 4Well 14Well 15
Active wells
11
Serves
6,727 people · Columbiana County
EPA ID
OH1500312

About this area's water

Courthouse building in Columbiana, Ohio
Courthouse building in Columbiana, OhioPhoto: 636Buster, CC BY-SA 3.0 · Wikimedia Commons
Did you know
  • Columbiana's finished water leaves the plant at pH 9.4, a signature of conventional lime softening; the CCR notes the water is stable to slightly scale-forming.
  • The 2016-2018 plant replaced one that had been in service since 1934, and customers started paying an $11 monthly surcharge in 2014 purely to prove to USDA Rural Development that the city could repay the construction…
  • The city is prospecting for water like a mining company: it has already run a fracture trace study along its raw water lines and plans an electrical imaging survey over 23.2 acres north of the plant to pinpoint where to…
  • Of the 29 analytes tested in the 2025 UCMR 5 rounds, only lithium was detected; the six regulated PFAS compounds were not found.
  • The system ran 195 samples and 96 bacterial tests in 2025 from 48 daily sampling points, with no total coliform detections and no violations.

Source: 2025wqr.columbianaohio.gov

History6
  • 1934Original City of Columbiana water treatment plant and raw water well field constructed.
  • 1954Major modifications to the water treatment plant and well field.
  • 1977Second round of major modifications to the plant and well field; the resulting facility had a peak capacity of 1.0 MGD and nine raw water wells.
  • 2006City concluded the existing plant was beyond its useful life and could not be modified or expanded to meet demand or current standards; authorized design of an entirely new plant.
  • 2014Water customers began paying an $11.00 monthly surcharge to build a fund demonstrating to USDA Rural Development that the city could repay a construction loan.
  • 2016Construction began on an all-new 2.25 MGD water treatment plant just north of the old plant site, with two new raw water wells and about 19,100 linear feet of raw water main; completed over two years…

Source: 2025wqr.columbianaohio.govcolumbianaohio.gov

Treatment & pressure

How it is treated

Groundwater from 11 wells (grouped in six well fields) in the aquifer assigned to the Allegheny Formation, Pennsylvanian age. The 2016-2018 replacement plant has a peak capacity of 2.25 MGD and treats by conventional lime softening, aeration, coagulation, sedimentation, stabilization, chlorination…

Source: 2025wqr.columbianaohio.gov

Water pressure

Not published. No pressure figures or pressure-zone map appear in the CCR or on the city site. The 2025 CCR does report two finished-water storage tanks of 1,000,000 and 500,000…

Source: 2025wqr.columbianaohio.gov

What it costs

No water rate schedule is published on columbianaohio.gov, and the city's codified ordinances (American Legal Publishing) blocked automated retrieval, so no per-1,000-gallon…

Source: 2025wqr.columbianaohio.govcolumbianaohio.govinvoicecloud.com

Water quality & impurities10
ContaminantLevelLimitYear
Total trihalomethanes (TTHM)
Sample location DS201, 7/30/2025; DS202 was 16.9 ug/L. No violation.
25.9 ug/L80 ug/L MCL2025
Haloacetic acids (HAA5)
Sample location DS201, 7/30/2025; DS202 was 6.36 ug/L. No violation.
6.85 ug/L60 ug/L MCL2025
Fluoride
Added as a water treatment additive; daily operational tests average 0.98 mg/L.
1.125 mg/L4.0 mg/L MCL2025
Nitrate (as N)
Well below the MCL.
0.333 mg/L10 mg/L MCL2024
Radium 228
Erosion of natural deposits; reported with a +/- 0.377 pCi/L counting uncertainty.
0.399 pCi/L5 pCi/L MCL2023
Selenium1.80 ug/L50 ug/L MCL2023
Lead
90th percentile; 0 of 20 samples exceeded the action level.
0.0 ppb15 ppb action…2023
Copper
90th percentile; 0 of 20 samples exceeded the action level.
0.0133 ppm1.3 ppm action…2023
Total chlorine
Running average 0.9986 ppm, range 0.90 to 1.05 ppm, April 2024 through December 2025.
1.00 ppm4 ppm MRDL2024-202…
Lithium
The only analyte detected of 29 tested in the April and October 2025 UCMR 5 rounds; the six regulated PFAS (PFOA, PFOS…
11.0 ppbunregulated…2025

Source: 2025wqr.columbianaohio.gov

EPA compliance record

Lead at the tap: 90th-percentile result 0 ppb in 2023 (action level 15 ppb).

EPA record: no health-based violations since 2015.

3 violations of any kind logged since 2020, 3 of them paperwork (monitoring, reporting, public notice or consumer report).

Projects & plans7

Recent and current work

  • New 2.25 MGD water treatment plant, two new raw water wells and 19,100 ft of raw water main; demolition of… · $20 million · 2016-2018 · completed
    Funded with an $8,439,000 USDA Rural Development grant and an $11,224,000 USDA-RD loan, with the balance from Ohio Public Works Commission funds and direct…
  • Crestview 8-inch raw water line and two new wells · $1.2 million · 2025 · completed
    11,408 linear feet (2.16 miles) installed by directional boring, capacity 1.382 MGD; line completed May 2025. The CCR gives about $1.3 million in full funding…
  • Standby generator for wells #1 and #2 · $77,614 · 2025 · completed
    Funded largely by a $50,000 grant; the Water Department paid $27,614.

Source: 2025wqr.columbianaohio.gov

Planned or needed

  • Second well-site standby generator · $42,486 · 2026 · under construction
    Delivered May 20, 2026, with the automatic transfer switch due in June; awaiting a concrete pad and wiring. Once installed the plant will have 1.38 MGD of…
  • Electrical imaging (EI) geophysical survey for new well sites north of the water plant · $21,000 · unknown · planned
    About 23.2 acres to be surveyed; the CCR estimates $17,500 to $21,000. A fracture trace study, the first step, is already complete. Overhead and underground…
  • Additional production wells along the new and existing raw water lines · planned
    Goal is to secure long-term supply and to raise raw water capacity from 1.38 MGD to the plant's 2.25 MGD maximum.
  • Additional standby generators to cover the full 2.25 MGD plant capacity · needed
    The Water Department says it is seeking grants and other funding.

Source: 2025wqr.columbianaohio.gov

Supply stress

The Ohio EPA source water assessment rates the likelihood of the aquifer becoming contaminated as relatively low to moderate under existing conditions, and the city has an active wellhead protection posture plus a backflow and cross-connection program. The binding constraint is quantity, not quality: the plant can treat 2.25 MGD but raw…

Source: 2025wqr.columbianaohio.gov

Sewers

Sanitary

The City of Columbiana operates its own Waste Water Department for sanitary sewer service (utility billing 330-482-2173 option 1; after-hours emergencies via police dispatch 330-482-9292). No treatment plant description, capacity, receiving stream or rate schedule is published on the city website.

Storm

Not published; no storm sewer or stormwater utility information appears on the city site.

Source: columbianaohio.gov

Sourcesverified

Compiled from the utility's own reports and public records, then independently re-checked against primary sources.

Main supplier in 1 ZIP code

Serves

Main water supplier in 1 ZIP code

Population-weighted resident shares; a ZIP code can have more than one system on record. Recomputed from each ZIP's own system list, not from the map's cached footprint.

Buys from · Sells to

Columbiana City does not buy water from another system on record; it treats its own source water.

No other system is on record buying water from Columbiana City.

Photograph

Courthouse building in Columbiana, Ohio
Courthouse building in Columbiana, OhioPhoto: 636Buster · CC BY-SA 3.0 · Wikimedia Commons

On the map

Show this system's territory on the map — 1 ZIP code in all.

Sources

U.S. EPA SDWIS and Community Water System Service Area Boundaries (v3, 2026), Ohio EPA primacy data, 2020 census blocks: the system serving most residents, traced through purchases to the treating utility; Ohio EPA 2023 Sewer and Water Rate Survey (Ohio State, May 2025) for household bills; Ohio EPA DEFA loan awards since 2016 for the loans paragraph · EPA SDWIS · EPA service area boundaries · Ohio EPA drinking water · Ohio EPA rate survey

Notable facts: 2025wqr.columbianaohio.gov

History: 2025wqr.columbianaohio.gov, columbianaohio.gov

Water quality: 2025wqr.columbianaohio.gov

Planned work: 2025wqr.columbianaohio.gov

Water pressure: 2025wqr.columbianaohio.gov

Capital projects: 2025wqr.columbianaohio.gov

Rates: 2025wqr.columbianaohio.gov, columbianaohio.gov, invoicecloud.com

Sewers: columbianaohio.gov

Treatment: 2025wqr.columbianaohio.gov

Supply stress: 2025wqr.columbianaohio.gov

Cite this page

Cite this page as:

Cracked Buckeye (Open Shower Co), "Columbiana City · OH1500312", https://crackedbuckeye.com/water/OH1500312/, built 2026-09-16, accessed [date].

Machine-readable: /api/water/OH1500312.json (open JSON, CC BY 4.0 for the compilation; the underlying records keep their own terms) · How to cite · Report a correction · Built 2026-09-16