Water system

Miami Co-n25a Extension

EPA ID OH5502303 · Miami County · 2,367 people served

Great Miami Buried Valley Aquifer (wells)
Groundwater

Miami Co-n25a Extension buys its water from Troy City.

The system's record

Great Miami Buried Valley Aquifer (wells)
Groundwater
Miami Co-n25a Extension buys its water from Troy City. Troy City treats groundwater from Great Miami Buried Valley Aquifer (wells).
Wells: EPA lists 10 active wells. ODNR well logs locate 8 public-supply wells inside Troy City's wellhead protection zone, 68 to 125 ft deep, in sand & gravel and gravel/sand/clay. Zoom in to see them as dots.
Well EWell EWell EWell EWell EWell WWell WWell WWell 16Well 19
Aquifer
Great Miami Buried Valley Aquifer
Active wells
10
Serves
26,305 people · Miami County
EPA ID
OH5501612

10 production wells near the Great Miami River at Miami Shores Golf Course/Troy City Park draw from the buried valley sand-and-gravel aquifer.

About this area's water Troy City

Adams Street Bridge over the Great Miami River in Troy, Ohio
Adams Street Bridge over the Great Miami River in Troy, OhioPhoto: Antony-22, CC BY-SA 4.0 · Wikimedia Commons
Did you know
  • Troy's ten production wells sit under a public golf course (Miami Shores) and a city park, tapping the glacial-outwash sand and gravel buried along the ancient course of the Great Miami River.
  • Troy does not fluoridate its water - twice, by referendum, residents voted against it. The 0.38 ppm of fluoride in the tap is what nature put in the aquifer and treatment left behind.
  • Water rates in Troy have not changed since January 1, 2017, even as the city raised sewer rates for 2026.
  • The plant has treatment capacity for 16 million gallons a day but averaged 3.66 million in 2025 and peaked at 5.62 million - roughly a third of what it could produce.
  • Troy's own utility fee schedule contains an order-of-magnitude typo, describing 1,000 cubic feet of sewage as 'approximately 75,000 gallons.' It is about 7,480.

Source: troyohio.govtroyohio.govtroyohio.gov

History6
  • 1999Plant treatment expansion projects completed, raising future treatment capacity to 16 million gallons per day; emergency power added to the plant and both well fields.
  • 2017A new 0.75 million gallon elevated tower on W. Stanfield Road is completed to improve fire flows and reliability in the Extra High Service pressure zone. Water rates set on 1/1/2017 are still the…
  • 2022November: construction begins on a $11.8 million expansion of the city's wastewater treatment plant, after two years of planning.
  • 2023Troy participates in the fifth round of the federal Unregulated Contaminant Monitoring Rule (UCMR 5), which includes PFAS sampling; results are available from the water department on request and are…
  • 2024October: Phase 1 of the wastewater plant expansion goes online, raising capacity from 7 to 9 MGD, adding a third aeration tank and nutrient-removal technology, and moving the plant from Class III to…
  • 2025Troy holds an unconditioned license to operate; sampling for 34 contaminants finds most non-detect. Sewer rates rise effective 1/1/2026 while water rates stay at their 2017 level.

Source: troyohio.govtroyohio.govtroyohio.gov

Treatment & pressure

How it is treated

Ten production wells at Miami Shores Golf Course and Troy Community Park draw from the buried valley sand-and-gravel aquifer associated with the Great Miami River. Raw well water is pumped to the Troy Water Treatment Plant at 300 E. Staunton Road, where it is softened, clarified, disinfected and…

Source: troyohio.govtroyohio.govtroyohio.gov

Water pressure

No psi figures published. The city says only that after treatment water is 'maintained at a sufficient pressure for residential, commercial, industrial, and firefighting…

Source: troyohio.gov

What it costs

$6.14 per 1,000 gallons

Typical household bill about $23 a month for water.

CAUTION - Troy bills water by the cubic foot, not the gallon. Water rates, effective 1/1/2017 (Codified Ordinances 913.01) and unchanged since: inside city, 0-200 cf is covered by…

Source: troyohio.govtroyohio.gov

Water quality & impurities10
ContaminantLevelLimitYear
Total trihalomethanes (TTHM)
Range 18.7-20.9 ppb. No violation.
20.9 ppb802025
Haloacetic acids (HAA5)
Range <2.8-3.0 ppb.
3.0 ppb602025
Total chlorine
Range 0.84-1.00 ppm.
0.96 ppm4 (MRDL)2025
Tetrachloroethylene (PCE)
Range <0.07-0.2 ppb. Typical source: discharge from industrial chemical factories.
0.2 ppb52025
Trichloroethylene (TCE)
Range <0.08-0.1 ppb.
0.1 ppb52025
cis-1,2-Dichloroethylene
Range <0.04-0.4 ppb.
0.4 ppb702025
Fluoride
Naturally occurring - Troy does not add fluoride. The city says naturally occurring fluoride persists through treatment…
0.38 ppm42025
Barium
Erosion of natural deposits.
0.0469 ppm22025
Nitrate
Well below the MCL.
0.244 ppm102025
Lead (90th percentile)
0 of 30 samples over the action level. Copper 90th percentile 0.0346 ppm, 0 of 30 over the 1.3 ppm action level. A…
0.5 ppb15 (action…2025

Source: troyohio.govtroyohio.gov

EPA compliance record · Miami Co-n25a Extension

Lead at the tap: 90th-percentile result 0.4 ppb in 2024 (action level 15 ppb).

EPA record: no health-based violations since 2015.

3 violations of any kind logged since 2020, 3 of them paperwork (monitoring, reporting, public notice or consumer report).

EPA compliance record · Troy City (treats the water)

Lead at the tap: 90th-percentile result 0.5 ppb in 2025 (action level 15 ppb).

EPA record: no health-based violations since 2015.

Projects & plans6

Recent and current work

  • Water treatment plant expansion to 16 MGD capacity · 1999 · completed
    Treatment expansion projects completed in 1999 allowing future capacity up to 16 MGD; emergency power added to the plant and both well fields. No cost…
  • 0.75 MG elevated tower, W. Stanfield Road · 2017 · completed
    Built to improve fire flows and system reliability in the Extra High Service pressure zone. No cost published.
  • Wastewater treatment plant expansion, Phase 1 · $12 million · 2024 · completed
    Construction began November 2022, online October 2024. Raised capacity from 7 to 9 MGD, replaced components up to 50 years old, added a third aeration tank and…
  • Sewer rate increase effective 1/1/2026 · 2026 · completed
    City sewer volume charge raised to $50.41 per 1,000 cubic feet with an $11.00 minimum on a 5/8-inch meter (Codified Ordinances 915.10); rural rates to $63.01.…

Source: troyohio.govtroyohio.govtroyohio.gov

Planned or needed

  • Wastewater treatment plant expansion, Phase 2 · 2025 · planned
    Announced in October 2024 as scheduled for completion in 2025; replaces outdated sludge-handling equipment. No separate cost published and no completion notice…
  • Capital Improvements Plan · planned
    The city publishes a Capital Improvements Plan as an ArcGIS dashboard map rather than a document; individual water and sewer projects, costs and years could…

Source: troyohio.govtroyohio.gov

Supply stress

Troy's own water quality report states that the wellfield sits above a buried valley aquifer providing 'limited natural protection from contaminations infiltrating into the aquifer,' and that the aquifer supplying Troy is therefore 'considered to be highly susceptible to contamination.' The city runs a comprehensive wellhead protection…

Source: troyohio.govtroyohio.gov

Sewers

Sanitary

The City of Troy Wastewater Treatment Plant at 1400 Dye Mill Road is a conventional activated sludge plant run in a plug-flow valve configuration, discharging treated effluent to the Great Miami River under an NPDES permit. The city's page still lists a design capacity of 7 MGD with about 5.5 MGD average flow; the Phase 1 expansion that…

Storm

Not documented. No storm water utility, storm sewer rate or separate storm system description appears in Troy's master fee schedule or on the wastewater and utility pages reviewed.

Source: troyohio.govtroyohio.govtroyohio.gov

Sourcesverified

Compiled from the utility's own reports and public records, then independently re-checked against primary sources.

Present in 1 ZIP code

Serves

No ZIP code has Miami Co-n25a Extension on record as its main water supplier.

Also present in 1 more ZIP code

Population-weighted resident shares; a ZIP code can have more than one system on record. Recomputed from each ZIP's own system list, not from the map's cached footprint.

Buys from · Sells to

Miami Co-n25a Extension buys its water from Troy City.

No other system is on record buying water from Miami Co-n25a Extension.

On the map

Show this system's territory on the map — 1 ZIP code in all.

Sources

U.S. EPA SDWIS and Community Water System Service Area Boundaries (v3, 2026), Ohio EPA primacy data, 2020 census blocks: the system serving most residents, traced through purchases to the treating utility; Ohio EPA 2023 Sewer and Water Rate Survey (Ohio State, May 2025) for household bills; Ohio EPA DEFA loan awards since 2016 for the loans paragraph · EPA SDWIS · EPA service area boundaries · Ohio EPA drinking water · Ohio EPA rate survey

Cite this page

Cite this page as:

Cracked Buckeye (Open Shower Co), "Miami Co-n25a Extension · OH5502303", https://crackedbuckeye.com/water/OH5502303/, built 2026-09-16, accessed [date].

Machine-readable: /api/water/OH5502303.json (open JSON, CC BY 4.0 for the compilation; the underlying records keep their own terms) · How to cite · Report a correction · Built 2026-09-16