Water system

Canal Pointe Industrial Park

EPA ID OH2346603 · Fairfield County · 1,721 people served · owned by a local government

local buried-valley aquifer (wells near Diley Road)
Groundwater

Canal Pointe Industrial Park buys its water from Pickerington City.

The system's record

local buried-valley aquifer (wells near Diley Road)
Groundwater
Canal Pointe Industrial Park buys its water from Pickerington City. Pickerington City treats groundwater from local buried-valley aquifer (wells near Diley Road).
Wells: EPA lists 5 active wells. ODNR well logs locate 2 public-supply wells inside Pickerington City's wellhead protection zone, 63 to 85 ft deep, in shale and sand & gravel.
Well 6Well 2Well 7Well 8Well 9
Aquifer
local wells (buried-valley aquifer, Diley Rd well field, Fairfield Co.)
Active wells
5
Seller serves
19,141 people · Fairfield County
Seller's EPA ID
OH2301512

About this area's water Pickerington City

The history, photo, rates, sewer details and water quality notes below are for Pickerington City, which supplies the water Canal Pointe Industrial Park buys. They are not Canal Pointe Industrial Park's own figures.

Did you know
  • Pickerington was laid out in 1815 under the name Jacksonville, honoring Andrew Jackson's victory at New Orleans; the townspeople petitioned in 1827 to rename it after the man who founded it, Abraham Pickering.
  • Water and sewer rates rise 3% automatically every April 1, so bills climb without a council vote.
  • The four 'emergency' interconnects with Fairfield County Utilities are not decorative: in August 2025 the city pulled 512,000 gallons through one of them over four days.

Source: themunicipal.comdam.assets.ohio.govci.pickerington.oh.us

History6
  • 1815Abraham Pickering has the town surveyed and laid out on September 15, 1815, naming it Jacksonville after Andrew Jackson's victory at New Orleans; by 1820 it had 49 residents.
  • 1827Residents petition the Ohio legislature to rename the town Pickerington in Pickering's honor.
  • 1881Pickerington incorporated as a village.
  • 1988Pickerington's wastewater treatment plant constructed.
  • 1991Pickerington certified as a city.
  • 2009Wastewater treatment plant last upgraded.

Source: themunicipal.comen.wikipedia.orgdam.assets.ohio.gov

Treatment & pressure

How it is treated

Five wells at the water plant site west of Diley Road draw from the Newark River buried-valley aquifer.

Source: dam.assets.ohio.govci.pickerington.oh.uscityscenecolumbus.com

Water pressure

No CCR, city budget document or Ohio EPA record reviewed states a system psi figure or maps pressure zones.

What it costs at Pickerington City

$5.07 per 1,000 gallons

Typical household bill about $25 a month for water.

City of Pickerington utility billing schedule (current as of 2026).

Source: ci.pickerington.oh.us

Water quality & impurities10
ContaminantLevelLimitYear
Total Chlorine
Range 0.90-1.23 ppm.
1.11 ppm4 (MRDL)2025
Total Trihalomethanes (TTHM)
Range 10.4-11.2 ppb; about 14% of the standard.
11.2 ppb802025
Haloacetic Acids (HAA5)
Range 0-3.4 ppb.
3.4 ppb602025
Fluoride
Range 0.87-0.97 ppm.
0.92 ppm42025
Nitrate
From the 2024 CCR; not re-reported in 2025.
0.33 ppm102024
Barium
Reported in the 2024 CCR under reduced monitoring.
0.027 ppm22023

Reported in the 2024 CCR; radiologicals are on a reduced monitoring cycle.
4.2 pCi/L152020
Combined Radium 226/228
Reported in the 2024 CCR.
1.1 pCi/L52020
Lead (90th percentile)
Zero of 30 samples above the action level; carried forward unchanged in the 2025 CCR.
0.6 ppb15 (AL)2024
Copper (90th percentile)
Zero of 30 samples above the action level; carried forward in the 2025 CCR.
0.327 ppm1.3 (AL)2024

Source: ci.pickerington.oh.usci.pickerington.oh.us

EPA compliance record · Canal Pointe Industrial Park

Lead at the tap: 90th-percentile result 0 ppb in 2023 (action level 15 ppb).

EPA record: no health-based violations since 2015.

EPA compliance record · Pickerington City (treats the water)

Lead at the tap: 90th-percentile result 0.6 ppb in 2024 (action level 15 ppb).

EPA record: no health-based violations since 2015.

1 violation of any kind logged since 2020: 1 for a report, record or notice that was missing, late or incomplete (the yearly water quality report, a public notice, lead line records).

Projects & plans6

Recent and current work

  • Columbus interconnect · $150,000 · 2026 · planned
    Construction funded in the adopted FY2026 budget, Water Department, Fund 509.
  • Water Plant Capacity Plan / Improvement (Phase II design) · $600,000 · 2026 · planned
    FY2026 budget line 509.503.55692; $900,000 was budgeted for the same line in 2025.
  • Sanitary sewer lining · $200,000 · 2026 · planned
    Construction funded in the FY2026 budget, Sewer Department, Fund 511.
  • Tertiary disc filter replacement at the wastewater plant · $75,000 · 2026 · planned
    Design funded in the FY2026 budget, Fund 511. Replaces the cloth-media disk filters in the plant's tertiary stage.
  • Sycamore Creek bank stabilization · $50,000 · 2026 · planned
    Design/construction funded in the FY2026 budget, Stormwater Fund 513. Sycamore Creek is also the wastewater plant's receiving stream.

Source: ci.pickerington.oh.us

Planned or needed

  • Water plant capacity expansion (construction phase following the 2025-2026 design work) · planned
    Implied by two consecutive years of design funding ($900,000 in 2025, $600,000 for Phase II in 2026) under the 'Water Plant Capacity Plan/Improvement' line.

Source: ci.pickerington.oh.us

Supply stress

The city's CCRs rate the Newark River aquifer's susceptibility to contamination as moderate — the aquifer is sensitive and there are several potential contaminant sources inside the wellhead protection zone, which the Ohio EPA-approved Wellhead Protection Plan is meant to manage.

Source: ci.pickerington.oh.usci.pickerington.oh.usci.pickerington.oh.us

Sewers at Pickerington City

Sanitary

City-owned Pickerington WWTP at 525 Hill Road South, built in 1988 and last upgraded in 2009, with an average design flow of 3.2 MGD; recent annual median flows run about 2.5 MGD. It discharges to Sycamore Creek at river mile 4.5 (Great Miami-independent; Scioto basin, HUC 05060001-17-04).

Storm

Ohio EPA states the City of Pickerington has 100% separate sewers — no combined sewers. The city runs its own storm water utility, billed at $4.50 a month for residential customers, with an Engineering Department storm water management program.

Source: dam.assets.ohio.govci.pickerington.oh.usci.pickerington.oh.us

Sources

Serves

Canal Pointe Industrial Park is not mapped to any ZIP code on record.

Population-weighted resident shares; a ZIP code can have more than one system on record. Recomputed from each ZIP's own system list, not from the map's cached footprint.

Buys from · Sells to

Canal Pointe Industrial Park buys its water from Pickerington City.

No other system is on record buying water from Canal Pointe Industrial Park.

What the records show about Canal Pointe Industrial Park

Who runs it

EPA's record describes Canal Pointe Industrial Park as owned by a local government. It has 151 service connections and serves 1,721 people.

EPA classes it as a community water system, one that serves the same residents all year.

Its office telephone on EPA's record is 614-834-5111.

Source: EPA Safe Drinking Water Information System (SDWIS), water system record.

How the water is treated

Canal Pointe Industrial Park buys water that Pickerington City treats first, so the steps that count are the seller's. EPA's treatment table registers these steps for Pickerington City: aeration, corrosion control, cartridge filtration, chlorine disinfection, dechlorination, iron and manganese removal, fluoridation, reverse osmosis, and sand or media filtration.

The list is what each system registered with EPA for treatment plants EPA still shows as active, and it can lag a plant upgrade.

Source: EPA Safe Drinking Water Information System (SDWIS) treatment table (EPA Envirofacts, pulled September 2026).

Violations

EPA's record shows no health-based violations for Canal Pointe Industrial Park since 2015.

EPA logs no violations of any kind for Canal Pointe Industrial Park since 2020.

Source: EPA Safe Drinking Water Information System (SDWIS) violation records: health-based violations with compliance periods beginning in 2015 or later, all violations from 2020 or later (EPA Envirofacts, pulled November 2026).

Lead and copper at the tap

For the sampling period ending December 2023, EPA's record lists the 90th-percentile lead result at Canal Pointe Industrial Park as 0 ppb, under both the current 15 ppb action level and the 10 ppb level that applies from 2027. EPA records a result below the lab's reporting level as 0, so this is the result reported, not proof that no home sampled had lead.

EPA has 5 sampling periods on file for Canal Pointe Industrial Park since 2016, the first ending in 2016; no period was above 10 ppb.

Every water system has to inventory its service lines, the pipes from the main to each building. In the inventory Canal Pointe Industrial Park sent EPA, 151 lines are counted.

Service lines in the inventory
MaterialLines
Lead0
Galvanized, needing replacement0
Unknown material0
Not lead151
All lines151

Systems sample taps in the homes most likely to have lead pipes or solder. The 90th-percentile result is the level nine in ten of the sampled homes were at or below. Lead comes mostly from service lines and house plumbing, not the source water, so a low result for the system does not clear an old house.

EPA's dashboard status for this inventory: reported all required service line types.

Source: EPA Safe Drinking Water Information System (SDWIS) lead and copper 90th-percentile results (EPA Envirofacts), sampling periods ending 2016 or later; EPA's service line inventory dashboard, Ohio's 2026 Q2 submission.

PFAS

The water Canal Pointe Industrial Park buys is treated by Pickerington City, so the results below are Pickerington City's.

EPA's fifth national round of testing (UCMR 5) took 3 samples of the water entering the pipes of Pickerington City in 2024 to 2025 and measured 29 PFAS. EPA's UCMR 5 file shows no PFAS detected, PFOA and PFOS (federal limit 4 ng/L each) among them.

Ohio EPA's own statewide sampling tested 1 plant of Pickerington City (latest sample August 2020). Not one of the six PFAS tested (PFOA, PFOS, PFHxS, PFNA, GenX and PFBS) was detected.

Ohio EPA's current sampling status map lists 1 plant of Pickerington City as sampled, most recently June 2026.

PFAS are the 'forever chemicals' from firefighting foam, plating shops and non-stick coatings. Results are for water leaving the plant, not your tap.

Source: EPA UCMR 5 occurrence data (final release, August 2026); Ohio EPA statewide PFAS sampling, 2019 to 2021, and its sampling status map.

Disinfection byproducts

Chlorine that disinfects water also reacts with organic matter to form byproducts. Two groups have federal limits: total trihalomethanes (TTHM, 80 µg/L) and five haloacetic acids (HAA5, 60 µg/L), judged on running yearly averages at each sampling site.

For TTHM, the average of Canal Pointe Industrial Park's samples in 2019, the last year it was sampled, was 5.7 µg/L. The worst yearly average was 6 µg/L and the highest single sample was 9.2 µg/L, from 14 samples taken from 2013 to 2019.

For HAA5, the average in the last year sampled was 0 µg/L. The worst yearly average was 0 µg/L and the highest single sample was 0 µg/L, from 14 samples.

Disinfection byproducts in the distribution system
ByproductLimitLatest yearly averageWorst yearly averageHighest sampleSamples
TTHM80 µg/L5.7 µg/L (2019)6 µg/L9.2 µg/L14
HAA560 µg/L0 µg/L0 µg/L0 µg/L14

A yearly average of 0 means nothing was detected in that year's samples. EPA's file stops at 2019; Ohio EPA's Drinking Water Watch has newer results.

Source: EPA Six-Year Review 4 compliance monitoring data, 2012 to 2019, distribution-system samples (non-detects counted as zero).

Nitrate, arsenic and radioactivity

The water Canal Pointe Industrial Park buys is treated by Pickerington City, so the results below are Pickerington City's.

Nitrate: the highest of 8 samples was 0.17 mg/L (as nitrogen) in 2018; in 2019, the last year sampled, nitrate was not detected. No sample was over the limit of 10 mg/L. Nitrate above 10 is unsafe for infants.

Arsenic was not detected in 2 samples (limit 10 µg/L).

Nitrate, arsenic and radioactivity in finished water, 2012 to 2019
ContaminantSamplesHighest resultLimitSamples over limit
Nitrate (as nitrogen)80.17 mg/L10 mg/L0
Arsenic2not detected10 µg/L0

Measured in finished water: at the plant's entry points and in the distribution system; raw well and intake samples are left out. Non-detects count as zero.

Source: EPA Six-Year Review 4 compliance monitoring data, 2012 to 2019, finished water of Pickerington City.

Solvents and fuels

The water Canal Pointe Industrial Park buys is treated by Pickerington City, so the results below are Pickerington City's.

EPA's file holds results for all six solvent and fuel compounds it checked. Benzene, carbon tetrachloride, 1,2-dichloroethane, trichloroethylene, tetrachloroethylene, and vinyl chloride were not detected in 2 samples each.

Solvents and fuels in finished water, 2012 to 2019
CompoundLimitSamplesDetected inHighest resultSamples over limit
Benzene5 µg/L20 of 2not detected0
Carbon tetrachloride5 µg/L20 of 2not detected0
1,2-dichloroethane5 µg/L20 of 2not detected0
Trichloroethylene (TCE)5 µg/L20 of 2not detected0
Tetrachloroethylene (PCE)5 µg/L20 of 2not detected0
Vinyl chloride2 µg/L20 of 2not detected0

"Not detected" means the lab's result was below what its method can measure, not that the compound is absent. Non-detects count as zero in the highest-result column.

Source: EPA Six-Year Review 4 compliance monitoring data, 2012 to 2019, finished water of Pickerington City.

Farm chemicals and metals

The water Canal Pointe Industrial Park buys is treated by Pickerington City, so the results below are Pickerington City's.

EPA's file holds results for 8 of the nine herbicides and metals it checked. Not detected: atrazine, alachlor, chromium, cadmium, barium, mercury, selenium, and thallium, in 2 samples each.

Herbicides and metals in finished water, 2012 to 2019
SubstanceKindLimitSamplesDetected inHighest resultSamples over limit
AtrazineFarm chemical3 µg/L20 of 2not detected0
AlachlorFarm chemical2 µg/L20 of 2not detected0
ChromiumMetal100 µg/L20 of 2not detected0
CadmiumMetal5 µg/L20 of 2not detected0
BariumMetal2,000 µg/L20 of 2not detected0
MercuryMetal2 µg/L20 of 2not detected0
SeleniumMetal50 µg/L20 of 2not detected0
ThalliumMetal2 µg/L20 of 2not detected0

Non-detects count as zero in the highest-result column.

Source: EPA Six-Year Review 4 compliance monitoring data, 2012 to 2019, finished water of Pickerington City.

Bacteria in the pipes

From 2012 to 2019, 0 of 32 routine total coliform samples taken in the distribution system at Canal Pointe Industrial Park tested positive (0%); in 2019, the last year on file, 0 of 4 did.

A positive coliform test is a warning sign, not a violation by itself. E. coli is a sign that human or animal waste may have reached the water. Coliform counts are routine samples only; E. coli counts include repeat samples.

Source: EPA Six-Year Review 4 compliance monitoring data, 2012 to 2019, distribution-system presence/absence tests for total coliform and E. coli.

Fluoride

The Ohio Department of Health's report to the CDC (My Water's Fluoride) says Canal Pointe Industrial Park buys its water from Pickerington City, a system that adjusts the fluoride level to the recommended level for preventing tooth decay.

EPA's treatment table lists fluoridation among the steps at Pickerington City, which treats the water Canal Pointe Industrial Park buys.

Measured fluoride: 0.99 mg/L on average leaving the plants of Pickerington City, which supplies Canal Pointe Industrial Park, in 2017 (above the 0.7 mg/L level now recommended and well under the 4 mg/L limit); samples ran from 0.89 to 0.99 mg/L across 2 samples in 2012 to 2019.

The recommended level for preventing tooth decay is 0.7 mg/L; the federal limit is 4 mg/L. The treatment list is what each system registered with EPA and can lag a plant upgrade.

Source: CDC My Water's Fluoride (fluoridation status as reported by the Ohio Department of Health, fetched September 2026); EPA Safe Drinking Water Information System (SDWIS) treatment table; EPA Six-Year Review 4 compliance monitoring data, 2012 to 2019, entry-point fluoride samples.

Lithium

Lithium was not detected in 2 UCMR 5 samples at Pickerington City, which supplies Canal Pointe Industrial Park, last sampled in 2025 (the method reports from 9 µg/L).

Lithium is not regulated. EPA's draft health reference level is 10 µg/L, and it occurs naturally in deep groundwater, so well systems in the northwest run highest.

Source: EPA UCMR 5 occurrence data (final release, August 2026), samples from 2023 to 2025.

On the map

Show this system's territory on the map.

Sources

U.S. EPA SDWIS and Community Water System Service Area Boundaries (v3, 2026), Ohio EPA primacy data, 2020 census blocks: the system serving most residents, traced through purchases to the treating utility; Ohio EPA 2023 Sewer and Water Rate Survey (Ohio State, May 2025) for household bills; Ohio EPA DEFA loan awards since 2016 for the loans paragraph · EPA SDWIS · EPA service area boundaries · Ohio EPA drinking water · Ohio EPA rate survey

EPA's own record for this system: Enforcement and Compliance History report for OH2346603 (EPA ECHO).

Quick answers

Where does Canal Pointe Industrial Park get its water?

Canal Pointe Industrial Park buys its water from Pickerington City.

How many people does Canal Pointe Industrial Park serve?

Canal Pointe Industrial Park serves about 1,721 people.

Who owns Canal Pointe Industrial Park?

Canal Pointe Industrial Park is owned by a local government.

Is there lead in Canal Pointe Industrial Park water?

In the sampling period ending December 2023, EPA's record lists Canal Pointe Industrial Park's 90th-percentile lead level in tap samples as 0 ppb (the federal action level is 15 ppb). EPA records a result below the lab's reporting level as 0, so this is the result reported, not proof that no home had lead.

Cite this page

Cite this page as:

Cracked Buckeye, "Canal Pointe Industrial Park · OH2346603", https://crackedbuckeye.com/water/OH2346603/, built 2026-11-02, accessed [date].

How to cite · Report a correction · Built 2026-11-02