  "type": "water",
  "pwsid": "OH5900712",
  "name": "Mt Gilead Village",
  "county": "Morrow",
  "population": 3503,
  "producer": true,
  "source_class": "groundwater",
  "label": "Groundwater wells (5 wells)",
  "bodies": [],
  "intakes": [],
  "wells": 5,
  "aquifer": "",
  "notes": "",
  "urls": [],
  "chain": [
    "OH5900712"
  ],
  "plants": [],
  "facts": {
    "hist": [
      [
        "1817",
        "Settlement began at the site, listed under the name Whetsom though generally called Youngstown, per the Village of Mount Gilead's own local-history page."
      ],
      [
        "1832",
        "The Ohio legislature changed the name to Mount Gilead; the village was incorporated in 1839."
      ],
      [
        "1848",
        "Morrow County was formed and Mount Gilead became the county seat; the village's population was about 400."
      ],
      [
        "2012",
        "Ohio EPA completed a Source Water Susceptibility Analysis for the Mt. Gilead well field, rating its susceptibility to contamination as moderate."
      ],
      [
        "2025",
        "Council approved raising the base water rate $5 per year for 2026, 2027 and 2028 (March), and in the same month the village nominated its water treatment plant Phase 1 project for an Ohio EPA Water…"
      ],
      [
        "2025",
        "Bid package for the WTP Improvements Phase 1 project advertised September 19 and bids opened November 12, with an 18-month construction period scheduled to run January 2026 to July 2027."
      ]
    ],
    "treat": "Five village-owned wells in the north-central part of town, just east of State Route 61 with an access drive at 352 E. Union Street, draw from the Johnstown Complex sand-and-gravel aquifer (more than 20 feet to water, under roughly 50 feet of glacial till). Water is treated at the village's own…",
    "press": "Not published. Neither the 2025 CCR nor the GPD Group WTP improvements presentation states a typical distribution pressure; the presentation only notes that a new plant pressure…",
    "rate": {
      "g": 6.36,
      "n": "Codified Ordinance 911.01 (last amended by Ord. 1674, passed 7-16-12) sets a minimum charge of $20.72 per month for the first 300 cubic feet and $4.76 per 100 cubic feet above…",
      "m": 43.24
    },
    "imp": [
      [
        "Lead (90th percentile)",
        "12.64",
        "ppb",
        "15 (action…",
        "2025",
        "2 of 20 sampled homes exceeded the 15 ppb lead action level, though the 90th percentile stayed below it."
      ],
      [
        "Total trihalomethanes (TTHM)",
        "27.95",
        "ppb",
        "80",
        "2025",
        "Range of detections 19.0-36.9 ppb."
      ],
      [
        "Haloacetic acids (HAA5)",
        "2.95",
        "ppb",
        "60",
        "2025",
        "Range 0-5.9 ppb."
      ],
      [
        "Arsenic",
        "4.25",
        "ppb",
        "10",
        "2025",
        "Range 4.0-5.0 ppb; the CCR carries the standard advisory that the water meets the arsenic standard but does contain low…"
      ],
      [
        "Nitrate",
        "0.36",
        "mg/L",
        "10",
        "2025",
        ""
      ],
      [
        "Total chlorine",
        "1.6",
        "ppm",
        "4 (MRDL)",
        "2025",
        "Range 1.08-1.95 ppm."
      ],
      [
        "Copper (90th percentile)",
        "0.514",
        "ppm",
        "1.3 (action…",
        "2025",
        "0 of 20 samples above the action level."
      ],
      [
        "Barium",
        "0.0504",
        "mg/L",
        "2",
        "2024",
        ""
      ],
      [
        "Fluoride",
        "0.9",
        "mg/L",
        "4",
        "2024",
        ""
      ],
      [
        "Beryllium",
        "0.06",
        "ppb",
        "4",
        "2024",
        ""
      ]
    ],
    "proj": [
      [
        "Mt. Gilead WTP Improvements, Phase 1 - construction",
        6250000,
        "2026",
        "under construction",
        "GPD Group engineer's estimate of probable construction cost, including a $400,000 contingency that may not be used. Scope: three new 0.5 MGD iron filters…"
      ],
      [
        "Phase 1 construction management, observation and technical assistance",
        450000,
        "2026",
        "under construction",
        "Separate from the construction estimate, per the GPD Group funding slide."
      ]
    ],
    "plan": [
      [
        "Mt. Gilead WTP Improvements, Phase 2",
        null,
        "",
        "planned",
        "Scope named in the GPD presentation: new motor control center, new generator, new HVAC and miscellaneous domestic plumbing, and a new aerator. No cost estimate…"
      ]
    ],
    "stress": "Groundwater from a five-well field in the Johnstown Complex sand-and-gravel aquifer. Ohio EPA's April 2012 susceptibility analysis rates the source moderately susceptible: more than 20 feet of depth to water and roughly 50 feet of glacial till give some protection, but significant potential contaminant sources exist within the protection…",
    "sew": {
      "s": "The village owns and operates its own sanitary sewer system and sewage treatment plant. The plant runs partly on an on-site solar array, which the village describes as a 650 kW array with a public real-time generation dashboard, and uses ultraviolet disinfection: in 2025 council authorized an emergency payment of $20,125 to Trojan Tech…",
      "st": "The village maintains storm sewers - the water ordinance requires below-grade meter pits to drain to a storm sewer where practical, and council minutes in 2025 record storm drain and sewer issues resolved after heavy rainfall - but no storm sewer system…"
    },
    "fun": [
      "Mount Gilead softens its water by ion exchange, and the fingerprint shows up in the plant's own lab data: sodium averaged 158 mg/L in 2025 and peaked at 202 mg/L, while finished hardness averaged 136 mg/L.",
      "The 2025 lead and copper round put the 90th-percentile lead result at 12.64 ppb, just under the 15 ppb action level, with 2 of 20 sampled homes above the action level.",
      "The water plant was banned from selling bulk water after hydrant use was discovered, so the Phase 1 project includes a new bulk water fill station with a keypad, receipt printer and flow meter to sell it properly.",
      "The village's sewage treatment plant generates its own electricity from a solar array and publishes the output live on the web.",
      "Searching for 'Mt. Gilead' online is a trap: mtgilead.org belongs to a Christian camp and conference center in Sebastopol, California, not the Morrow County village, whose site is mountgilead.net."
    ],
    "src": {
      "history": [
        "https://www.mountgilead.net/mghistory.htm",
        "https://www.mountgilead.net/2025-MG-CCR.pdf",
        "https://www.mountgilead.net/water-plant-improvement-project.pdf",
        "https://www.morrowcountysentinel.com/2025/03/26/council-approves-water-rate-hike/"
      ],
      "treatment": [
        "https://www.mountgilead.net/2025-MG-CCR.pdf",
        "https://www.mountgilead.net/water-plant-improvement-project.pdf"
      ],
      "pressure": [
        "https://www.mountgilead.net/2025-MG-CCR.pdf",
        "https://www.mountgilead.net/water-plant-improvement-project.pdf"
      ],
      "rates": [
        "http://www.mountgilead.net/Chapter%20911%20Water%20Regulations%20%26%20Rates.pdf",
        "https://www.morrowcountysentinel.com/2025/03/26/council-approves-water-rate-hike/",
        "https://www.morrowcountysentinel.com/2025/05/01/focus-remains-on-water-recreation-projects/"
      ],
      "impurities": [
        "https://www.mountgilead.net/2025-MG-CCR.pdf"
      ],
      "projects": [
        "https://www.mountgilead.net/water-plant-improvement-project.pdf",
        "https://www.morrowcountysentinel.com/2025/05/01/focus-remains-on-water-recreation-projects/"
      ],
      "planned": [
        "https://www.mountgilead.net/water-plant-improvement-project.pdf"
      ],
      "water_stress": [
        "https://www.mountgilead.net/2025-MG-CCR.pdf",
        "https://www.mountgilead.net/water-plant-improvement-project.pdf"
      ],
      "sewer": [
        "https://www.mountgilead.net/sewerimpro.htm",
        "https://www.morrowcountysentinel.com/2025/05/01/focus-remains-on-water-recreation-projects/",
        "http://www.mountgilead.net/Chapter%20911%20Water%20Regulations%20%26%20Rates.pdf"
      ],
      "fun_facts": [
        "https://www.mountgilead.net/2025-MG-CCR.pdf",
        "https://www.mountgilead.net/water-plant-improvement-project.pdf",
        "https://www.mountgilead.net/sewerimpro.htm",
        "https://mtgilead.org/"
      ]
    }
  },
  "zips_served": [
    {
      "zip": "43338",
      "share": 0.2939,
      "dominant": true
    }
  ],
  "photo": {
    "url": "/photos/OH5900712.jpg",
    "caption": "1848 Morrow County courthouse in Mount Gilead, Ohio",
    "credit": "Wikimedia Commons",
    "license": "Public domain"
  },
  "url": "https://crackedbuckeye.com/water/OH5900712/",
  "api": "https://crackedbuckeye.com/api/water/OH5900712.json",
  "generated": "2026-09-16",
  "license": "CC BY 4.0 for the compilation; each source keeps its own terms",
  "cite": "Cracked Buckeye (Open Shower Co), \"Mt Gilead Village · OH5900712\", https://crackedbuckeye.com/water/OH5900712/, built 2026-09-16, accessed [date].",
  "schema": "https://crackedbuckeye.com/api/schema.json"
}