  "type": "water",
  "pwsid": "OH4302911",
  "name": "Lake County East Water Subdistrict",
  "county": "Lake",
  "population": 40656,
  "producer": true,
  "source_class": "erie",
  "label": "Lake Erie",
  "bodies": [
    "Lake Erie"
  ],
  "intakes": [
    "Lake Co Lake Erie Int"
  ],
  "wells": 0,
  "aquifer": "",
  "notes": "East sub-district = Bacon Road WTP, Painesville Township (opened 1982, 9 MGD design, ~3 MGD produced), serving Perry Village, North Perry Village, Perry Township, Madison Township and parts of Painesville Township.",
  "urls": [
    "https://www.lakecountyohio.gov/utilities/bacon-road-water-treatment-facility/",
    "https://www.lakecountyohio.gov/utilities/water-division/"
  ],
  "chain": [
    "OH4302911"
  ],
  "plants": [
    {
      "n": "Lake County East Water Subdistrict Treatment Facility (Bacon Road / East Sub-Dis",
      "a": "Lake Road, Painesville Township, OH (exact street number not confirmed)",
      "la": 41.767,
      "lo": -81.195,
      "pt": "intake",
      "wb": "Lake Erie",
      "src": "Lake Erie, drawn through a 48-inch pipe extending about 4,000 feet offshore from the Painesville Township plant",
      "cls": "erie"
    }
  ],
  "facts": {
    "hist": [
      [
        "1982",
        "Bacon Road Water Treatment Facility opens in August 1982 as the East Sub-District plant in Painesville Township."
      ],
      [
        "2017-2023",
        "Lake Erie bluff erosion near the plant accelerates, taking roughly 60 feet of bank, most of it in the final two years."
      ],
      [
        "2023",
        "Lake County posts a shore protection and bluff rehabilitation project in March to safeguard the plant's intake infrastructure."
      ]
    ],
    "treat": "Conventional surface-water treatment: traveling screens, rapid mix, flocculation, sedimentation with about four hours of settling, dual-media anthracite-and-sand filtration, then disinfection. A 300,000-gallon backwash tank and two 500,000-gallon clearwells.",
    "press": "not published; no system-wide psi figure found in county utility materials",
    "rate": {
      "g": 6.26,
      "n": "Metered water is $4.68 per 100 cubic feet (748 gal) with a $42.12 quarterly minimum; the $4.48 per 1,000 gallons often quoted is the sanitary sewer rate.",
      "m": null
    },
    "imp": [
      [
        "Turbidity",
        "0.12",
        "NTU",
        "0.3",
        "2025",
        "Highest 2025 reading for Lake County East; 100% of monthly samples met the limit"
      ]
    ],
    "proj": [
      [
        "Lake County East Water Plant Shore Protection",
        null,
        "2023",
        "planned",
        "Bluff and shoreline rehabilitation protecting telecom lines and two water mains carrying up to 9 MGD; cost not published."
      ]
    ],
    "plan": [
      [
        "Shore erosion mitigation at Bacon Road plant",
        null,
        "2023",
        "planned",
        "Erosion had reached within 20 feet of telecom lines and 50 feet of two water mains as of the March 2023 announcement."
      ]
    ],
    "stress": "The documented risk is physical, not supply quantity: Lake Erie bluff erosion of roughly 10 feet a year has cut 60 feet of bank since 2017 near the plant. Ohio EPA treats all surface sources as susceptible; no harmful algal bloom problem is documented for this eastern-basin intake.",
    "sew": {
      "s": "Lake County Department of Utilities runs six wastewater plants: the Gary L. Kron Water Reclamation Facility in Mentor (20 MGD) and the Madison plant (5 MGD), both discharging to Lake Erie, plus four package plants (Heatherstone to the Grand River, Rio Grande, Sunshine Acres, Dodd Hill).",
      "st": "No dedicated county stormwater utility fee found and no combined-sewer-overflow program documented for this area; the county does publish sanitary sewer overflow notifications."
    },
    "fun": [
      "Raw water is drawn through a 48-inch pipe extending about 4,000 feet out into Lake Erie and pumped to the plant at 4,200 gallons per minute.",
      "The plant produces about 3 million gallons a day for roughly 36,000 people in Perry Village, North Perry, Perry and Madison townships and part of Painesville Township.",
      "Lake County's water operation holds the Partnership for Safe Water's Director's Award of Recognition, which the county says puts it in the top 3% of Ohio systems.",
      "The bank in front of the plant is retreating about 10 feet a year, and two mains capable of carrying 9 million gallons a day now sit 50 feet from the edge."
    ]
  },
  "zips_served": [
    {
      "zip": "44081",
      "share": 0.9218,
      "dominant": true
    },
    {
      "zip": "44057",
      "share": 0.5638,
      "dominant": true
    },
    {
      "zip": "44077",
      "share": 0.1979,
      "dominant": false
    },
    {
      "zip": "44041",
      "share": 0.007,
      "dominant": false
    }
  ],
  "photo": null,
  "url": "https://crackedbuckeye.com/water/OH4302911/",
  "api": "https://crackedbuckeye.com/api/water/OH4302911.json",
  "generated": "2026-09-16",
  "license": "CC BY 4.0 for the compilation; each source keeps its own terms",
  "cite": "Cracked Buckeye (Open Shower Co), \"Lake County East Water Subdistrict · OH4302911\", https://crackedbuckeye.com/water/OH4302911/, built 2026-09-16, accessed [date].",
  "schema": "https://crackedbuckeye.com/api/schema.json"
}