  "aquifer": "Jerome Fork Basin aquifer",
  "notes": "12 wells (70-300 ft) in Pleistocene sand-and-gravel aquifer of the Jerome Fork Basin, north of the treatment plant; no purchased water.",
  "urls": [
    "https://members.ashlandoh.com/list/member/city-of-ashland-water-treatment-dept-ashland-323",
    "https://www.ashland-ohio.com/departments/city-utilities-water/water-treatment-facility",
    "https://dam.assets.ohio.gov/image/upload/ohiodnr.gov/documents/geology/GWPP74_Sprowls_2009_Ashland.pdf"
  ],
  "chain": [
    "OH0300112"
  ],
  "plants": [
    {
      "n": "Ashland City Water Treatment Facility",
      "a": "1630 Cleveland Rd, Ashland, OH 44805",
      "la": 40.8825,
      "lo": -82.3195,
      "pt": "approximate",
      "wb": "Jerome Fork sand-and-gravel aquifer",
      "src": "Wells (13 active) in the Jerome Fork Basin sand-and-gravel aquifer, sited generally north of the treatment plant on Cleveland Road",
      "cls": "groundwater",
      "in": [
        {
          "n": "Jerome Fork Well Field",
          "wb": "Jerome Fork Basin sand-and-gravel aquifer — Pleistocene-age glacial outwash sand and gravel filling the Jerome Fork valley",
          "role": "primary",
          "src": "All 13 active city wells draw from shallow Pleistocene sand-and-gravel deposits along Jerome Fork, about 2 miles northeast of Ashland; Ohio EPA rates the aquifer highly susceptible to contamination (13 wells · generally 30-100 ft)",
          "la": 40.91,
          "lo": -82.29,
          "pt": "approximate",
          "wells": [
            "Well 1",
            "Well 2",
            "Well 3",
            "Well 4",
            "Well 5",
            "Well 6",
            "Well 7",
            "Well 10",
            "Well 11",
            "Well 12",
            "Well 13",
            "Well 14",
            "Well 15"
          ]
        }
      ]
    }
  ],
  "facts": {
    "hist": [],
    "treat": "",
    "press": "",
    "rate": {
      "g": null,
      "n": "No per-1,000-gallon or per-ccf schedule could be retrieved. Ashland bills by metered cubic feet, with the monthly charge depending on usage and service-line size; the rate table…",
      "m": null
    },
    "imp": [],
    "proj": [
      [
        "Lead and Copper Rule service line inventory",
        null,
        "2024",
        "completed",
        "Inventory completed and published online; identifies lead, galvanized-requiring-replacement and unknown-material service lines."
      ],
      [
        "SLIM notification compliance",
        null,
        "2025",
        "completed",
        "Signed Service Line Inventory Material verification form returned to Ohio EPA 5/13/2025, resolving the reporting violation."
      ],
      [
        "Water softener #1 replacement",
        800000,
        "2023",
        "unknown",
        "Council authorized a not-to-exceed $800,000 purchase in November 2023 to replace a softener installed in 1970 and refurbished in 2008. Completion was not…"
      ],
      [
        "Well #7 rehabilitation",
        75000,
        "2023",
        "unknown",
        "New pump, new lining and stainless steel drop pipe; contractor Moody's of Dayton Inc. Council approved November 2023; completion not confirmed in the sources…"
      ],
      [
        "Well #14 repair",
        198600,
        "2025",
        "unknown",
        "Council approved roughly $198,600 in May 2025 to repair a collapsed well casing rather than $400,000-$600,000 for a replacement well. Completion not confirmed…"
      ]
    ],
    "plan": [
      [
        "Lead, galvanized and unknown service line replacement",
        null,
        "2025 onward",
        "needed",
        "Federal Lead and Copper Rule Improvements require annual notification and eventual replacement of lead, galvanized-requiring-replacement and unknown-material…"
      ],
      [
        "Wastewater plant overflow remedy / plant replacement",
        70000000,
        "2023…",
        "needed",
        "Wastewater side, not drinking water. The city engineer said fixes would cost millions, with a new treatment plant potentially $60 million to $80 million (the…"
      ]
    ],
    "stress": "",
    "sew": {
      "s": "City-operated separate sanitary sewer system (not combined) with a wastewater plant on about 25 acres discharging to Lang Creek, a tributary of the Jerome Fork. The plant dates to 1939-40 with original buildings and tanks from 1939 and 1957, and treats roughly 4 million gallons a day. A 5-million-gallon equalization basin built in 2005…",
      "st": "The city's sewers are described as a separate sanitary system rather than combined, but no storm sewer detail, stormwater utility, or stormwater fee was found for Ashland in the sources reviewed."
    },
    "fun": [],
    "src": {
      "history": [
        "https://files-backend.assets.thrillshare.com/documents/asset/uploaded_file/3440/Ashland/41901bac-5ff3-44fe-a2d9-ed56472b087a/Ashland-2025-ccr-with-SLIM-notice_update.pdf",
        "https://www.ashlandsource.com/2022/05/20/ashland-water-rates-to-increase-12-by-july-new-surcharge-placed-on-water-sewer/",
        "https://www.ashlandsource.com/2023/11/10/ashland-water-treatment-plant-to-get-new-800k-water-softener/",
        "https://www.ashlandsource.com/2025/05/27/city-of-ashland-opts-to-repair-collapsed-water-well/"
      ],
      "treatment": [
        "https://files-backend.assets.thrillshare.com/documents/asset/uploaded_file/3440/Ashland/41901bac-5ff3-44fe-a2d9-ed56472b087a/Ashland-2025-ccr-with-SLIM-notice_update.pdf",
        "https://members.ashlandoh.com/list/member/city-of-ashland-water-treatment-dept-ashland-323",
        "https://www.ashlandsource.com/2025/05/27/city-of-ashland-opts-to-repair-collapsed-water-well/"
      ],
      "rates": [
        "https://www.ashlandsource.com/2022/05/20/ashland-water-rates-to-increase-12-by-july-new-surcharge-placed-on-water-sewer/",
        "https://www.ashlandutility.com/upload/20190204095624203.pdf"
      ],
      "impurities": [
        "https://files-backend.assets.thrillshare.com/documents/asset/uploaded_file/3440/Ashland/41901bac-5ff3-44fe-a2d9-ed56472b087a/Ashland-2025-ccr-with-SLIM-notice_update.pdf"
      ],
      "projects": [
        "https://files-backend.assets.thrillshare.com/documents/asset/uploaded_file/3440/Ashland/41901bac-5ff3-44fe-a2d9-ed56472b087a/Ashland-2025-ccr-with-SLIM-notice_update.pdf",
        "https://www.ashlandsource.com/2023/11/10/ashland-water-treatment-plant-to-get-new-800k-water-softener/",
        "https://www.ashlandsource.com/2025/05/27/city-of-ashland-opts-to-repair-collapsed-water-well/"
      ],
      "planned": [
        "https://files-backend.assets.thrillshare.com/documents/asset/uploaded_file/3440/Ashland/41901bac-5ff3-44fe-a2d9-ed56472b087a/Ashland-2025-ccr-with-SLIM-notice_update.pdf",
        "https://www.ashlandsource.com/2023/01/11/why-ashland-could-spend-millions-on-its-wastewater-treatment-plant-in-future-years/"
      ],
      "water_stress": [
        "https://files-backend.assets.thrillshare.com/documents/asset/uploaded_file/3440/Ashland/41901bac-5ff3-44fe-a2d9-ed56472b087a/Ashland-2025-ccr-with-SLIM-notice_update.pdf",
        "https://www.ashlandsource.com/2025/05/27/city-of-ashland-opts-to-repair-collapsed-water-well/",
        "https://members.ashlandoh.com/list/member/city-of-ashland-water-treatment-dept-ashland-323"
      ],
      "sewer": [
        "https://www.ashlandsource.com/2023/01/11/why-ashland-could-spend-millions-on-its-wastewater-treatment-plant-in-future-years/"
      ],
      "fun_facts": [
        "https://files-backend.assets.thrillshare.com/documents/asset/uploaded_file/3440/Ashland/41901bac-5ff3-44fe-a2d9-ed56472b087a/Ashland-2025-ccr-with-SLIM-notice_update.pdf",
        "https://members.ashlandoh.com/list/member/city-of-ashland-water-treatment-dept-ashland-323",
        "https://www.ashlandsource.com/2025/05/27/city-of-ashland-opts-to-repair-collapsed-water-well/",
        "https://www.ashlandsource.com/2023/11/10/ashland-water-treatment-plant-to-get-new-800k-water-softener/"
      ]
    }
  },
  "zips_served": [
    {
      "zip": "44805",
      "share": 0.61,
      "dominant": true
    }
  ],
  "photo": {
    "url": "/photos/OH0300112.jpg",
    "caption": "Ashland County Courthouse in downtown Ashland, Ohio",
    "credit": "User:OHWiki",
    "license": "Public domain"
  },
  "url": "https://crackedbuckeye.com/water/OH0300112/",
  "api": "https://crackedbuckeye.com/api/water/OH0300112.json",
  "generated": "2026-09-16",
  "license": "CC BY 4.0 for the compilation; each source keeps its own terms",
  "cite": "Cracked Buckeye (Open Shower Co), \"Ashland City · OH0300112\", https://crackedbuckeye.com/water/OH0300112/, built 2026-09-16, accessed [date].",
  "schema": "https://crackedbuckeye.com/api/schema.json"
}